BS 6000:1996
Superseded
View Superseded by
Guide for the selection of an acceptance sampling system, scheme or plan for inspection of discrete items in lots
Hardcopy , PDF
English
05-15-1996
07-25-2005
Committees responsible
National foreword
Introduction
Guide
1 Scope
2 References
3 The selection process
4 Acceptance sampling systems, schemes and plans
5 ISO Standards for 'acceptance' sampling of lots
6 Some general considerations influencing a
selection
7 Making a comparison of the methods for sampling
inspection
8 Other methods sometimes adopted in practice
9 Market and production conditions - effect on the
selection process
10 The final selection - realism
Annexes
A Bibliography
Figures
1 Operating characteristic curve defined by producer's
risk (PR) and consumer's risk (CR)
2 Operating characteristic curve defined by acceptable
quality level (AQL) and limiting quality (LQ)
3 OC curves: Four sampling plans for AQL 1,5%
non-conforming, normal inspection, single sampling
4 Normal distribution
5 Distribution with large positive skewness
6 Comparison of operating characteristic curves for
single, double, multiple and sequential sampling
plans (code letter L, AQL 0,65%
7 Comparison of average sample sizes for single,
double, multiple and sequential sampling
(for acceptance plans of figure 6)
8 Chart illustrating the selection procedures when
production is continuous and run length exceeds 10
lots of original inspection
9 Chart illustrating the selection procedures when
production is not continuous or run is 10 lots or
fewer
Tables
1 Comparison of sample sizes in inspection by
attributes and by variables
2 Equivalent sampling plans for code letter L,
AQL 0,65
3 Guide for selection of a candidate acceptance
sampling system, scheme or plan based on the
inspection situation
4A Guide for the selection of an acceptance sampling
system, scheme or plan, using existing market
conditions
4B Guide for the selection of an acceptance sampling
system, scheme or plan, using existing production
conditions
Gives advice in the selection of an acceptance sampling system, scheme or plan. Applies to a wide variety of inspection situations. Deals only with confined acceptance sampling of products that are supplied in lots and that can be classified as consisting of products that are supplied in lots and that can be classified as consisting of discrete items (discrete articles of product).
| Committee |
SS/5
|
| DevelopmentNote |
Together with BS 6001-0(1996), supersedes BS 6000(1972). Also numbered as ISO TR 8550. (06/2004)
|
| DocumentType |
Standard
|
| Pages |
58
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
A newer version of this standard is available.
View Current Edition View Current Edition View Current Edition