1. Scope
2. Definitions
3. Management of the lifting operation
4. Planning of the lifting operation
5. Selection and duties of personnel
6. Minimum attributes of personnel
7. Selection of cranes
8. Safety
9. Siting of cranes
10. Erection and dismantling
11. Procedures and precautions
12. Operating conditions
13. Testing and examination
14. Legal requirements
15. Ropes
16. Slinging and handling of loads
17. Raising or lowering of personnel
18. Balling operations
19. Signalling systems
Tables
1. Legal requirements for the inspection, testing and
thorough examination of cranes
2. Severity of deterioration of steel wire ropes
3. Typical examples of cumulative effect of
deterioration of steel wire ropes
4. Weight of materials
Figures
1. Adverse effect of a swinging load on load radius
2. Recommended crane signals
3. Side loading on jib
4. Paying out rope
5. Serving of ropes (before cutting)
6. Transferring rope from reel to reel
7. Some points to be considered during the examination
of the rope
Includes safe systems of work, management, planning, general recommendations for selection, erection and dismantling, testing, operation and maintenance of cranes and the selection of drivers, slingers and signallers.
| Committee |
MHE/3/11
|
| DevelopmentNote |
Partially supersedes BS 5744(1979). Supersedes 85/72574 DC and 95/710437 DC. (08/2004) Supersedes BS CP3010(1972). (07/2015)
|
| DocumentType |
Standard
|
| Pages |
42
|
| PublisherName |
British Standards Institution
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
A newer version of this standard is available.
View Current Edition