• Shopping Cart
    There are no items in your cart
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

BS 8005-3:1989

Superseded

Superseded

View Superseded by

Sewerage Guide to planning and construction of sewers in tunnel

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

11-30-1989

Superseded date

06-15-1998

Superseded by

BS EN 752-4:1998

US$391.00
Excluding Tax where applicable
Summarise this standard

Committees responsible
Foreword
Section one. General
1 Scope
2 Definitions
3 Abbreviations and symbols
Section two. Planning, design, safety and choice of
                lining
4 Planning
5 Design
6 Safety
7 Preformed primary tunnel linings
8 In situ primary tunnel linings
9 Secondary linings
Section three. Construction
10 Construction techniques
11 Permissible deviations
Appendices
A Bibliography
B Stability number
Tables
1 Stages of site investigation
2 Range of preformed linings in the UK
3 Recommended permissible deviations for internal
    faces
Figures
1 Details and dimensions of typical bolted precast
    concrete segmental lining
2 Details and dimensions of typical expanded precast
    concrete segmental lining
3 Guidance on the range of possible ground treatments
    related to D10 of soil
4 Influence of heading geometry on stability number at
    tunnel collapse
Index

Gives guidance on the planning, design and construction of sewers constructed in tunnel. Includes guidance on tunnel linings and ancillary materials and recommends permissible deviations for internal faces. Covers definitions, abbreviations and symbols, safety, construction techniques and permissible deviations.

Committee
B/505
DevelopmentNote
REPLACES CP 2005:1968. OBSOLESCENT - current for existing equipment, not to be used for new designs
DocumentType
Standard
Pages
38
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

⚠

A newer version of this standard is available.

View Current Edition
US$391.00
Excluding Tax where applicable