BS EN 61277:1998
Withdrawn
Terrestial photovoltaic (PV) power generating systems. General and guide
Hardcopy , PDF
English
12-15-1998
04-01-2009
INTRODUCTION
1 Scope
2 Overview of possible major sub-system components and
interfaces
2.1 Purpose
2.2 Major configurations
3 Description of major sub-systems, components and
interfaces of the PV power generating system
3.1 Purpose
3.2 Master control and monitoring (MCM)
3.3 PV sub-system
3.4 DC conditioner
3.5 DC/d.c. interface
3.6 Storage
3.7 Inverter
3.8 AC/a.c. interface
3.9 Utility interface
Figures
1 PV power generating system - Major functional elements,
sub-systems, and power flow diagram
2 Elements of PV power generating systems with typical
applications
Annexes
A Example configurations derived from figure 2, with some
typical applications
B Glossary
Forms a guide and provides an overview of terrestrial PV power generating systems, together with the functional elements of such systems. Provides an overview of major sub-systems, a functional description of major components and interfaces and a table with possible configurations.
| Committee |
GEL/82
|
| DevelopmentNote |
Also numbered as IEC 61277 (11/2005)
|
| DocumentType |
Standard
|
| Pages |
16
|
| PublisherName |
British Standards Institution
|
| Status |
Withdrawn
|
| Standards | Relationship |
| NBN EN 61277 : 1998 | Identical |
| EN 61277:1998 | Identical |
| DIN EN 61277:1999-02 | Identical |
| NF EN 61277 : 2000 | Identical |
| UNE-EN 61277:2000 | Identical |