BS EN 61850-7-1:2011
Withdrawn
Communication networks and systems for power utility automation Basic communication structure. Principles and models
Hardcopy
English
11-30-2011
10-19-2020
| Committee |
PEL/57
|
| DevelopmentNote |
Supersedes 00/203116 DC. (11/2003) Supersedes 08/30182501 DC. (11/2011)
|
| DocumentType |
Standard
|
| Pages |
140
|
| PublisherName |
British Standards Institution
|
| Status |
Withdrawn
|
| Supersedes |
IEC 61850-7-1:2011 introduces the modelling methods, communication principles, and information models that are used in the various parts of the IEC 61850-7 series. The purpose is to provide - from a conceptual point of view - assistance to understand the basic modelling concepts and description methods for:
- substation-specific information models for power utility automation systems,
- device functions used for power utility automation purposes, and
- communication systems to provide interoperability within power utility facilities. Compared to the first edition, this second edition introduces:
- the model for statistical and historical statistical data,
- the concepts of proxies, gateways, LD hierarchy and LN inputs,
- the model for time synchronisation,
- the concepts behind different testing facilities,
- the extended logging function. It also clarifies certain items.
| Standards | Relationship |
| IEC 61557-1:2007 | Identical |
| EN 61557-1:2007 | Identical |
| DIN EN 61850-7-1:2012-04 | Identical |
| EN 61850-7-1:2011 | Identical |
| IEC 61850-7-1:2011 | Identical |
| I.S. EN 61850-7-1:2011 | Identical |
| NF EN 61850-7-1 : 2012 | Identical |
| UNE-EN 61850-7-1:2011 | Equivalent |
This standard has been withdrawn and is no longer current. No replacement edition is available.