BS QC 200012:1996
Withdrawn
Process assessment schedule for printed board design facilities
Hardcopy , PDF
English
12-15-1996
03-12-2014
Committees responsible
National foreword
Foreword
Introduction
1 General requirements
2 Quality requirements of the technology
3 Specialist contractor documentation requirements
4 Audits
5 Corrective actions and failure analysis
6 Contractor to customer interface
7 Training
8 Notification of modifications
Annexes
A Definitions
B Form and Content of Process Specifications
C Form and Content of Process Manuals
D Format of First Page of Process Approval Report
E Example Abstract of Description of Process Approval
F Audit Checklist (Technical)
G Example Customer Detail Specification
H Typical GCD Considerations
I Abbreviations
Figures
1 Design philosophy
2 Design cycle interrelationships
3 Typical activity flowchart
Giver terms, definitions, symbols, quality system, assessment and methods of verification together with other requirements relating to the operation of a Printed Board/Design Facility to comply with the general requirements of the CECC system for electronic components of assessed quality. Not applicable to the activity of designing the basic electronic functionality of a product or sub-assembly.
| Committee |
EPL/501
|
| DevelopmentNote |
Also numbered as CECC 200012 Supersedes 95/210651 DC (08/2005) Reviewed and confirmed by BSI, December 2009. (11/2009)
|
| DocumentType |
Standard
|
| Pages |
42
|
| PublisherName |
British Standards Institution
|
| Status |
Withdrawn
|
| Supersedes |
| BS 6221-25:2000 | Printed wiring boards Guide to the rework and repair of soldered surface mounted printed board assemblies |
| 11/30255124 DC : 0 | BS EN 61191-1 - PRINTED BOARD ASSEMBLIES - PART 1: GENERIC SPECIFICATION - REQUIREMENTS FOR SOLDERED ELECTRICAL AND ELECTRONIC ASSEMBLIES USING SURFACE MOUNT AND RELATED ASSEMBLY TECHNOLOGIES |
| CECC 200000 : 1993 | REQUIREMENTS FOR PROCESS ASSESSMENT SCHEDULES FOR PROCESS APPROVAL |
| BS EN ISO 9001:2015 | Quality management systems. Requirements |
| IECQ 001002-3:2005 | IEC QUALITY ASSESSMENT SYSTEM FOR ELECTRONIC COMPONENTS (IECQ) - RULES OF PROCEDURE - PART 3: APPROVAL PROCEDURES |
| CECC 00114-5 : 94 AMD 2 | PROCESS APPROVAL OF SPECIALIST CONTRACTORS WITHIN THE ELECTRONIC COMPONENTS INDUSTRY |
| BS EN 100114-1:1997 | Rule of Procedure 14. Quality assessment procedures CECC requirements for the approval of an organization |
| ISO 9000:2015 | Quality management systems — Fundamentals and vocabulary |
| CECC 00401 : 91 AMD 1 | GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM |
| BS EN ISO 9000:2015 | Quality management systems. Fundamentals and vocabulary |