• Shopping Cart
    There are no items in your cart

CTI MANUAL CH. 12 : 2010

Superseded

Superseded

View Superseded by

FIELD-ERECTED COOLING TOWER FIRE PROTECTION

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-12-2013

Superseded date

03-15-2025

Superseded by

CTI MANUAL CH. 12:2023

US$13.00
Excluding Tax where applicable

1.0 Scope
2.0 Definitions
3.0 Cooling Tower Fire Hazards
4.0 Fire Risk Analysis
5.0 Fire Protection Options
6.0 Design and Material Choices
7.0 Bibliography

Gives fire protection considerations for field erected cooling towers.

DevelopmentNote
Included in CTI MANUAL. (03/2009)
DocumentType
Standard
Pages
8
PublisherName
Cooling Technology Institute
Status
Superseded
SupersededBy

CTI STD 203 : 0 INDUSTRIAL COOLING TOWER STANDARD

NFPA 214 : 2016 WATER-COOLING TOWERS
NFPA 251 : 2006 FIRE RESISTANCE OF BUILDING CONSTRUCTION AND MATERIALS
NFPA 13 : 2016 INSTALLATION OF SPRINKLER SYSTEMS

US$13.00
Excluding Tax where applicable