• Shopping Cart
    There are no items in your cart

DEFSTAN 00-40(PT2)/2(1994) : 1994

Withdrawn

Withdrawn

RELIABILITY AND MAINTAINABILITY - PART 2: GENERAL APPLICATION GUIDANCE ON THE USE OF PART 1

Published date

01-12-2013

Withdrawn date

01-08-2002

Sorry this product is not available in your region.

Gives information and guidance for the sponsor, Procurement Executive and the contractor towards achieving commonality of interpretation of R&M.

DevelopmentNote
Supersedes DEFSTAN 00-40(PT2)/1(1988) (06/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Withdrawn
Supersedes

DEFSTAN 00-40(PT4)/1(1991) : 1991 RELIABILITY AND MAINTAINABILITY - PART 4: GUIDANCE FOR WRITING NATO R & M REQUIREMENTS DOCUMENTS
DEFSTAN 00-60(PT2)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR
DEFSTAN 00-60(PT20)/6(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES
DEFSTAN 00-60(PT22)/4(2003) : 2003 INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION
DEFSTAN 00-60(PT3)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT
DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
DEFSTAN 00-60(PT21)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING
DEFSTAN 00-60(PT25)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING
DEFSTAN 00-56(PT2)/2(1996) : 1996 SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 2: GUIDANCE
DEFSTAN 00-60(PT23)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING
DEFSTAN 00-60(PT1)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR)
DEFSTAN 02-339/2(2002) : INTERIM REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
DEFSTAN 00-25(PT14)/1(2000) : 2000 HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 14: MILITARY LAND VEHICLE DESIGN
DEFSTAN 00-60(PT24)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION
DEFSTAN 00-44/1(2007) : 2007 RELIABILITY AND MAINTAINABILITY DATA COLLECTION AND CLASSIFICATION
DEFSTAN 00-42(PT2)/1(1997) : 1997 RELIABILITY AND MAINTAINABILITY ASSURANCE GUIDES - PART 2: SOFTWARE
DEFSTAN 00-44(PT3)/1(1997) : 1997 RELIABILITY AND MAINTAINABILITY DATA COLLECTION AND CLASSIFICATION - PART 3: INCIDENT SENTENCING - SEA
DEFSTAN 00-44(PT2)/1(1994) : 1994 RELIABILITY AND MAINTAINABILITY DATA COLLECTION AND CLASSIFICATION - PART 2: DATA CLASSIFICATION AND INCIDENT SENTENCING - GENERAL
DEFSTAN 00-56(PT1)/2(1996) : 1996 SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 1: REQUIREMENTS
DEFSTAN 00-43(PT1)/1(1993) : 1993 RELIABILITY AND MAINTAINABILITY ASSURANCE ACTIVITY - PART 1: IN-SERVICE RELIABILITY DEMONSTRATIONS
DEFSTAN 00-43(PT2)/1(1995) : 1995 RELIABILITY AND MAINTAINABILITY ASSURANCE ACTIVITY - PART 2: MAINTAINABILITY DEMONSTRATIONS
DEFSTAN 00-60(PT22)/5(2003) : 2003 INTEGRATED LOGISTIC SUPPORT PART 22: PROCEDURES FOR CODIFICATION
DEFSTAN 00-42(PT1)/1(1997) : 1997 RELIABILITY AND MAINTAINABILITY ASSURANCE GUIDES - PART 1: ONE-SHOT DEVICES/SYSTEMS
DEFSTAN 00-44(PT4)/1(1995) : 1995 RELIABILITY AND MAINTAINABILITY DATA COLLECTION AND CLASSIFICATION - PART 4: INCIDENT SENTENCING - LAND
DEFSTAN 21-59(PT2)/1(2005) : INTERIM SYSTEMS ENGINEERING GUIDE FOR NAVAL COMBAT SYSTEMS - PART 2: (SSP 59)
DEFSTAN 00-60(PT26)/1(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 26: PROCEDURES FOR REPAIR ADMINISTRATION

Sorry this product is not available in your region.