DEFSTAN 00-40(PT8)/1(1992) : 1992
Withdrawn
Withdrawn
RELIABILITY AND MAINTAINABILITY - PART 8: PROCUREMENT OF OFF-THE-SHELF EQUIPMENT (ARMP-8)
Published date
01-12-2013
Publisher
Withdrawn date
01-09-2002
Sorry this product is not available in your region.
Gives advice on the measures to be taken for achieving acceptable levels of R&M in the procurement of Off-the Shelf (OTS) equipment. Coverage includes: OTS procurement process start; staff requirement; decision to proceed to tender; final programme considerations; R&M aspects of the specification; market investigation.
| DocumentType |
Standard
|
| PublisherName |
UK Ministry of Defence Standards
|
| Status |
Withdrawn
|
| DEFSTAN 00-60(PT2)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR |
| DEFSTAN 00-60(PT20)/6(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES |
| DEFSTAN 00-60(PT22)/4(2003) : 2003 | INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION |
| DEFSTAN 00-60(PT0)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
| DEFSTAN 00-60(PT3)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT |
| DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 | INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
| DEFSTAN 00-60(PT21)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING |
| DEFSTAN 00-60(PT25)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING |
| DEFSTAN 00-60(PT24)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 24: PROCEDURES FOR ORDER ADMINISTRATION |
| DEFSTAN 00-60(PT23)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING |
| DEFSTAN 00-60(PT1)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR) |
| DEFSTAN 02-339/2(2002) : INTERIM | REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES |
| DEFSTAN 00-25(PT14)/1(2000) : 2000 | HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 14: MILITARY LAND VEHICLE DESIGN |
| DEFSTAN 00-60(PT21)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 21: PROCEDURES FOR INITIAL PROVISIONING |
| DEFSTAN 02-309/2(2002) : 2002 | REQUIREMENTS FOR GAS TURBINES |
| DEFSTAN 00-60(PT24)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION |
| DEFSTAN 00-60(PT22)/5(2003) : 2003 | INTEGRATED LOGISTIC SUPPORT PART 22: PROCEDURES FOR CODIFICATION |
| DEFSTAN 21-59(PT2)/1(2005) : INTERIM | SYSTEMS ENGINEERING GUIDE FOR NAVAL COMBAT SYSTEMS - PART 2: (SSP 59) |
| DEFSTAN 00-60(PT26)/1(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 26: PROCEDURES FOR REPAIR ADMINISTRATION |
| DEFSTAN 00-40(PT1)/2(1987) : 1987 | RELIABILITY AND MAINTAINABILITY - PART 1: MANAGEMENT RESPONSIBILITIES AND REQUIREMENTS FOR PROGRAMMES AND PLANS |
| ARMP-8 : 1991 | RELIABILITY & MAINTAINABILITY (R&M) IN THE PROCUREMENT OF OFF-THE-SHELF (OTS) EQUIPMENT |
| DEFSTAN 00-40(PT2)/1(1988) : 1988 | RELIABILITY AND MAINTAINABILITY - PART 2: GENERAL APPLICATION GUIDANCE ON THE USE OF PART 1 (ARMP-1) |
Summarise
Sorry this product is not available in your region.