SECTION 1 - DRAWINGS
SECTION 2 - GENERAL REQUIREMENTS
SECTION 3 - METHODS USED
3.1 Sighting Battens Method
3.1.1 Erection and Siting
3.1.2 Equipment
3.1.3 Precautions
3.2 Theodolite Sighting Method (I)
3.2.1 Erection and Siting
3.2.2 Preparation for Marking Up
3.2.3 Marking Up
3.2.4 Taking Breakage
3.2.5 Equipment
3.3 Theodolite Sighting Method (2)
3.3.1 Erection and Siting
3.3.2 Marking Up and Taking Breakage
SECTION 4 - WHEN BREAKAGE IS MEASURED
4.1 Surface Ships
4.1.1 Launch
4.1.2 At first docking
4.1.3 During build period
4.1.4 During sea trials
4.1.5 Other occasions
4.2 Submarines
4.3 Recording Results
ANNEX A - RELATED DOCUMENTS
ANNEX B - DEFINITIONS AND ABBREVIATIONS
ANNEX C - QUALITY ASSURANCE CERTIFICATION
ANNEX D PROCUREMENT CHECK LIST
ALPHABETICAL INDEX
Gives the methods of taking deflections of hull structure of Surface Ships and Submarines and the occasions of taking such readings.
| DevelopmentNote |
This is a redesignation of NES 145. (01/2001) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (09/2007)
|