• Shopping Cart
    There are no items in your cart

DEFSTAN 02-53/2(2001) : 2001

Withdrawn

Withdrawn

GUIDE TO THE COMPLETION OF FORM DGSF 129- SHORE SUPPORT REQUIREMENTS FOR WARSHIPS

Published date

01-12-2013

Withdrawn date

10-30-2007

Sorry this product is not available in your region.

Description
Content
Preface
SECTION 1 - GENERAL REQUIREMENTS
0 Introduction
1 Scope
2 Warning
3 Related Documents
4 Definitions
5 Abbreviations
SECTION 2 - PERFORMANCE REQUIREMENTS
6 General Requirements
SECTION 3 - DESIGN REQUIREMENTS/GUIDANCE
7 Classification of Form WSAF 129
8 Requirement for Form WSAF 129
9 Responsibility of MILSM
10 In-Service
11 Distribution of Form WSAF 129
12 Notes on the Completion of Form WSAF 129
13 SMP
14 AMP/BAMP/BMP and LOP
15 DAMP and DP
16 Refit Period (R) and LOP(R)
17 Technical Requirements of Main and Miscellaneous Services
   and Facilities
18 WSAF 129 Section E1/1-3 - Electrical Power
19 WSAF 129 Section E2/1-2 - Domestic Steam
20 WSAF 129 Sections E3/1-2 - E4/1-2 - LP Air and HP Air
21 WSAF 129 Section E5/1-2 Sea Water
22 WSAF 129 Section E6/1-2 Chilled Water
23 WSAF 129 Section E7/1-3 Cranage
24 WSAF 129 Section F1 - Miscellaneous Services
25 WSAF 129 Section F2 - Miscellaneous Facilities
26 WSAF 129 Section G - Special Docking and Underwater
                        Requirements
27 WSAF 129 Section H - Plan of Ship/Shore Connection Point
28 WSAF 129 Section J - Main Removal Routes
29 WSAF 129 Section K - Items Calling for Special Attention
30 Form WSAF 129A - Request To Change WSAF 129
ANNEX A - Form WSAF 129A - Request For Change To WSAF 129
ANNEX B - Specimen - Unclassified Form WSAF 129 - Shore
          Support Requirements For Warships

Gives requirements for the completion of Warship Support Agency Form (WSAF) 129/129A, which lists the shore support services and facilities required by surface ships and submarines.

DevelopmentNote
Supersedes DEFSTAN 02-53/1(2000) & DEFSTAN 07-203/1(2000) (06/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Withdrawn
Supersedes

DEFSTAN 02-314/3(2005) : 2005 COMPRESSED AIR SYSTEMS
DEFSTAN 02-314/2(2001) : INTERIM COMPRESSED AIR SYSTEMS
DEFSTAN 02-387/2(2001) : 2001 REQUIREMENTS FOR CHEMICAL CLEANING OF CHILLED WATER SYSTEMS FOR HM SURFACE SHIPS, SUBMARINES AND ROYAL FLEET AUXILIARY VESSELS
DEFSTAN 02-250(PT0)/1(2013) : 2013 MARITIME SUPPORT MANAGEMENT - PART 0: GENERAL INFORMATION FOR TYPE A AND TYPE B SUPPORT
DEFSTAN 02-102(PT3)/1(2004) : 2004 REQUIREMENTS FOR AIR CONDITIONING AND VENTILATION - PART 3: SPECIFICATION FOR TESTING AND CLEANING VENTILATION TRUNKING

DEFSTAN 08-106/1(2000) : 2000 REQUIREMENTS FOR EMERGENCY BREATHING SYSTEMS (EBS) IN SUBMARINES - CATEGORY 1
DEFSTAN 02-319/2(2002) : INTERIM REQUIREMENTS FOR AVIATION FUEL SYSTEMS IN HM SURFACE SHIPS
DEFSTAN 07-223/1(2000) : 2000 CHEMICAL CLEANING OF CHILLED WATER SYSTEM - CATEGORY 2
DEFSTAN 02-728/2(2001) : INTERIM REQUIREMENTS FOR DOMESTIC HOT AND COLD FRESH WATER SYSTEMS
DEFSTAN 07-260/1(2000) : 2000 REQUIREMENTS FOR ESCAPE AND RESCUE FACILITIES FOR SUBMARINES - CATEGORY 1
DEFSTAN 02-719/1(2000) : 2000 SEA WATER SYSTEMS FOR HM SURFACE SHIPS CATEGORY 2
DEFSTAN 08-101(PT2)/1(2000) : 2000 REQUIREMENTS FOR THE CONSTRUCTION AND SYSTEM ARRANGEMENTS IN MAGAZINES AND WEAPON STORAGE COMPARTMENTS - CATEGORY 1 - PART 2: HM SUBMARINES
DEFSTAN 02-720/2(2002) : 2002 WASTE DISPOSAL POLICY
DEFSTAN 61-5(PT4)/2(1992) : 1992 ELECTRICAL POWER SUPPLY SYSTEMS BELOW 650 VOLTS - PART 4: POWER SUPPLIES IN HM SHIPS
DEFSTAN 02-373/1(2000) : 2000 CODE OF PRACTICE FOR COMPRESSED AIR SYSTEMS CLEANLINESS CATEGORY 2
DEFSTAN 02-704(PT4)/1(2000) : 2000 REQUIREMENTS FOR CATHODIC PROTECTION - PART 4: SHIPS FITTING OUT, SHIPS IN REFIT OR LAID-UP
DEFSTAN 02-560/1(2000) : 2000 REQUIREMENTS FOR THE DESIGN OF AUTOMATIC TIME DIVISION MULTIPLEX TELEPHONE EXCHANGE SYSTEMS CATEGORY 1
DEFSTAN 02-712/1(2000) : 2000 REQUIREMENTS FOR SEWAGE AND GREY - WATER SYSTEMS FOR SURFACE SHIPS (OBSOLESCENT) CATEGORY 2
DEFSTAN 08-103(PT2)/1(2000) : 2000 REQUIREMENTS FOR MAINTENANCE ENVELOPES AND REMOVAL ROUTES - CATEGORY 2 - PART 2: REQUIREMENTS FOR SUBMARINES
DEFSTAN 08-101(PT1)/1(2000) : 2000 REQUIREMENTS FOR THE CONSTRUCTION AND SYSTEM ARRANGEMENTS IN MAGAZINES AND WEAPON STORAGE COMPARTMENTS - CATEGORY 1 - PART 1: HM SURFACE SHIPS
DEFSTAN 02-366/1(2000) : 2000 TRIALS AND INSPECTION OF DESALINATION MACHINERY
DEFSTAN 07-220/1(2000) : 2000 REQUIREMENTS FOR DESIGN AND INSTALLATION OF FUEL SYSTEMS FOR GAS TURBINES AND DIESEL ENGINES IN SURFACE SHIPS - CATEGORY 2

Sorry this product is not available in your region.