DEFSTAN 05-24/2(1976) : 1976
Withdrawn
Withdrawn
View Superseded by
INSPECTION SYSTEM REQUIREMENTS FOR INDUSTRY
Published date
01-12-2013
Publisher
Withdrawn date
05-31-1989
Superseded by
Sorry this product is not available in your region.
Describes Contractor's inspection system to ensure material and services conform to contract.
| DevelopmentNote |
Supersedes DEFSTAN 05-24/1(1973) (07/2003)
|
| DocumentType |
Standard
|
| PublisherName |
UK Ministry of Defence Standards
|
| Status |
Withdrawn
|
| SupersededBy | |
| Supersedes |
| DEFSTAN 59-70(PT1)/1(1977) : 1977 | CAPACITORS, VARIABLE, OF ASSESSED QUALITY - PART 1: GENERAL REQUIREMENTS |
| DEFSTAN 66-21/1(1979) : 1979 | MULTIMETER SET |
| DEFSTAN 05-58(PT0)/1(2006) : 2006 | GUIDE TO DEFENCE STANDARD 05-58 PART 1: SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES OF ISOLATED LOTS |
| DEFSTAN 66-9(PT1)/2(1983) : 1983 AMD 2 1987 | INSTRUMENTS, ELECTRICAL INDICATING (HERMETICALLY SEALED) 26 MM AND 38 MM - PART 1: SPECIFICATION |
| DEFSTAN 61-12(PT21)/2(1985) : 1985 | WIRES, CORDS, AND CABLES, ELECTRICAL - METRIC UNITS - PART 21: WIRES AND CABLES, LIGHTWEIGHT, EXTRUDED INSULATION, 135 DEGREES TIN PLATED, AND 150 DEGREES SILVER PLATED CONDUCTORS |
| DEFSTAN 66-7(PT1)/3(1983) : 1983 AMD 1 1985 | INSTRUMENTS, ELECTRICAL INDICATING (SEALED) 50 MM TO 100 MM - PART 1: SPECIFICATION |
| DEFSTAN 05-70/1(1985) : 1985 AMD 1 1988 | GUIDE TO DEFENCE STANDARD 05-58: SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES OF ISOLATED LOTS |
| DEFSTAN 61-16/1(1982) : 1982 | DIFFERENTIAL CURRENT OPERATED EARTH-LEAKAGE CIRCUIT BREAKERS |
Summarise
Sorry this product is not available in your region.