DEFSTAN 07-251/1(2000) : 2000
Withdrawn
Withdrawn
REQUIREMENTS FOR THE PRESERVATION AND PAINTING OF COMPARTMENTS IN SURFACE SHIPS - CATEGORY 2
Published date
01-12-2013
Publisher
Withdrawn date
12-07-2007
Sorry this product is not available in your region.
| DevelopmentNote |
It renumbers DEFSTAN 02-763(2000). (01/2001) Supersedes DEFSTAN 02-759/1(2000) and DEFSTAN 02-761/1(2000). (07/2002) Supersedes DEFSTAN 02-765/1(2000). (07/2003) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purpose in support of existing in-service equipment. (10/2004)
|
| DocumentType |
Standard
|
| PublisherName |
UK Ministry of Defence Standards
|
| Status |
Withdrawn
|
| Supersedes |
| DEFSTAN 02-718/1(2002) : 2002 | REQUIREMENTS FOR SEWAGE PLANT AND ANCILLARY EQUIPMENT IN HM SURFACE SHIPS AND SUBMARINES |
| DEFSTAN 02-123(PT1)/2(2002) : 2002 | REQUIREMENT FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 1: LAUNDRIES AND ASSOCIATED COMPARTMENTS |
| DEFSTAN 02-319/2(2002) : INTERIM | REQUIREMENTS FOR AVIATION FUEL SYSTEMS IN HM SURFACE SHIPS |
| DEFSTAN 02-101(PT1)/2(2005) : 2005 | REQUIREMENTS FOR DESIGN AND FITTING OUT OF WORKSHOPS MAINTENANCE SPACES AND ENGINEERING STORES FOR HM SURFACE SHIPS - PART 1: COMMON REQUIREMENTS |
| DEFSTAN 02-120/2(2002) : INTERIM | REQUIREMENTS FOR WATER CLOSETS, URINALS, BATHROOMS AND WASHING FACILITIES IN HM SURFACE SHIPS AND SUBMARINES |
| DEFSTAN 02-329/2(2005) : 2005 | REQUIREMENTS FOR HEAT EXCHANGERS FOR HM SURFACE SHIPS AND SUBMARINES |
| DEFSTAN 02-102(PT1)/3(2005) : 2005 | REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 1: HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES |
| DEFSTAN 02-121(PT1)/2(2006) : 2006 | REQUIREMENTS FOR GALLEYS AND ASSOCIATED SPACES - PART 1: COMMON REQUIREMENTS |
| DEFSTAN 00-101(PT1)/1(2005) : 2005 | DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 1: SURFACE SHIPS |
| DEFSTAN 02-101(PT2)/2(2005) : 2005 | REQUIREMENTS FOR DESIGN AND FITTING OUT OF WORKSHOPS MAINTENANCE SPACES AND ENGINEERING STORES FOR HM SURFACE SHIPS - PART 2: SPECIFIC REQUIREMENTS |
| DEFSTAN 02-339/2(2002) : INTERIM | REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES |
| DEFSTAN 02-339/3(2006) : 2006 | REQUIREMENTS FOR STEERING AND STABILIZER SYSTEMS FOR HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES |
| DEFSTAN 02-320/2(2002) : INTERIM | REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF FUEL SYSTEMS FOR GAS TURBINE ENGINES AND DIESEL ENGINES IN HM SURFACE SHIPS AND SUBMARINES |
| DEFSTAN 02-105(PT1)/2(2004) : 2004 | REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS |
| DEFSTAN 02-122/1(2002) : INTERIM | REQUIREMENTS FOR CATERING EQUIPMENT |
| DEFSTAN 02-125/2(2004) : 2004 | REQUIREMENTS FOR NAAFI COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES |
| DEFSTAN 02-126(PT1)/2(2004) : 2004 | REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS |
| DEFSTAN 02-102(PT3)/1(2004) : 2004 | REQUIREMENTS FOR AIR CONDITIONING AND VENTILATION - PART 3: SPECIFICATION FOR TESTING AND CLEANING VENTILATION TRUNKING |
| DEFSTAN 02-752(PT2)/1(2005) : 2005 | GRP SURVEY AND REPAIR REQUIREMENTS FOR HM SHIPS, BOATS, CRAFT AND STRUCTURES - PART 2: MAINTENANCE AND REPAIR REQUIREMENTS FOR GRP IN SHIPS, BOATS AND CRAFT (SINGLE SKIN) |
Summarise
Sorry this product is not available in your region.