EI MODEL CODE SAFE PRACTICE PT17 VOL.1 : 1ED 2009
Withdrawn
MODEL CODE OF SAFE PRACTICE IN THE PETROLEUM INDUSTRY - PART 17: VOLUME 1: HIGH PRESSURE AND HIGH TEMPERATURE (HPHT) WELL PLANNING
04-01-2009
05-24-2022
Acknowledgements
Foreword
1 Introduction
2 HPHT project risk and uncertainty management
3 Well objectives
4 Project risk
5 Well planning good practice
6 Rig selection
7 Safety planning for operations
8 Further safety related technical issues
9 Suggested further reading and references
Annex A - Specifications
Annex B - Managed pressure drilling and fluid engineering
Annex C - Glossary of terms and abbreviations
Specifies details on project risk and uncertainty management, roles and responsibilities, project management framework, quality assurance and quality control, well planning good practice, rig selection and planning for safety operations.
| DevelopmentNote |
Also available as a SET along with VOL 2 & VOL 3. (06/2009)
|
| DocumentType |
Standard
|
| PublisherName |
Energy Institute (formerly Institute of Petroleum - IP)
|
| Status |
Withdrawn
|
| BS EN ISO 17776:2016 | Petroleum and natural gas industries. Offshore production installations. Major Accident hazard management during the design of new installations |
| BS IEC 61882:2001 | Hazard and operability studies (HAZOP studies). Application guide |
| BS 5760-5:1991 | Reliability of systems, equipment and components Guide to failure modes, effects and criticality analysis (FMEA and FMECA) |