GUIDANCE ON MEETING EXPECTATIONS OF EI PROCESS SAFETY MANAGEMENT FRAMEWORK - ELEMENT 15: INSPECTION AND MAINTENANCE
10-19-2015
10-18-2016
Foreword
Acknowledgements
1 Introduction
2 Arrangements for meeting expectations
3 Suggested compliance checks and performance measures
Annexes
Annex A - References and bibliography
Annex B - Glossary of abbreviations
Annex C - Mapping of process steps to EI PSM framework
expectations
Annex D - Example report template: Management and
supervisory field observations
Annex E - Example asset care policy worksheet
Annex F - Example authority to approve deferral of
inspection or maintenance
Annex G - Example flow diagram for risk based prioritisation
of emergent work
Annex H - Example risk and prioritisation matrices
Provides good practice for the management of assets and work equipment inspection and maintenance.
| DocumentType |
Standard
|
| PublisherName |
Energy Institute (formerly Institute of Petroleum - IP)
|
| Status |
Withdrawn
|
| EI PSM FRAMEWORK : 1ED 2010 | HIGH LEVEL FRAMEWORK FOR PROCESS SAFETY MANAGEMENT |
| EEMUA 206 : 2006 | RISK BASED INSPECTION: A GUIDE TO EFFECTIVE USE OF THE RBI PROCESS |
| ISO 55001:2014 | Asset management — Management systems — Requirements |
| ISO 20815:2008 | Petroleum, petrochemical and natural gas industries — Production assurance and reliability management |
| ISO 14224:2016 | Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment |
| EEMUA 231 : 2012 | THE MECHANICAL INTEGRITY OF PLANT CONTAINING HAZARDOUS SUBSTANCES - A GUIDE TO PERIODIC EXAMINATION AND TESTING |