• Shopping Cart
    There are no items in your cart

EI PSM GUID. MEET. EXPECT. - ELEMENT 15 : 1ED 2015

Withdrawn

Withdrawn

GUIDANCE ON MEETING EXPECTATIONS OF EI PROCESS SAFETY MANAGEMENT FRAMEWORK - ELEMENT 15: INSPECTION AND MAINTENANCE

Published date

10-19-2015

Withdrawn date

10-18-2016

Sorry this product is not available in your region.

Foreword
Acknowledgements
1 Introduction
2 Arrangements for meeting expectations
3 Suggested compliance checks and performance measures
Annexes
Annex A - References and bibliography
Annex B - Glossary of abbreviations
Annex C - Mapping of process steps to EI PSM framework
          expectations
Annex D - Example report template: Management and
          supervisory field observations
Annex E - Example asset care policy worksheet
Annex F - Example authority to approve deferral of
          inspection or maintenance
Annex G - Example flow diagram for risk based prioritisation
          of emergent work
Annex H - Example risk and prioritisation matrices

Provides good practice for the management of assets and work equipment inspection and maintenance.

DocumentType
Standard
PublisherName
Energy Institute (formerly Institute of Petroleum - IP)
Status
Withdrawn

EI PSM FRAMEWORK : 1ED 2010 HIGH LEVEL FRAMEWORK FOR PROCESS SAFETY MANAGEMENT
EEMUA 206 : 2006 RISK BASED INSPECTION: A GUIDE TO EFFECTIVE USE OF THE RBI PROCESS
ISO 55001:2014 Asset management — Management systems — Requirements
ISO 20815:2008 Petroleum, petrochemical and natural gas industries — Production assurance and reliability management
ISO 14224:2016 Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
EEMUA 231 : 2012 THE MECHANICAL INTEGRITY OF PLANT CONTAINING HAZARDOUS SUBSTANCES - A GUIDE TO PERIODIC EXAMINATION AND TESTING

Sorry this product is not available in your region.