EN 62116:2014
Current
Utility-interconnected photovoltaic inverters - Test procedure of islanding prevention measures
07-25-2014
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Testing circuit
5 Testing equipment
6 Test for single or multi-phase inverter
7 Documentation
Annex A (informative) - Islanding as it applies to PV systems
Annex B (informative) - Test for independent islanding
detection device (relay)
Annex C (informative) - Gate blocking sign
Bibliography
Annex ZA (normative) - Normative references
to international publications with their
corresponding European publications
IEC 62116:2014 provides a test procedure to evaluate the performance of islanding prevention measures used with utility-interconnected PV systems. This standard describes a guideline for testing the performance of automatic islanding prevention measures installed in or with single or multi-phase utility interactive PV inverters connected to the utility grid. The test procedure and criteria described are minimum requirements that will allow repeatability. Major changes with respect to the previous edition concern the DC power source and test conditions.
| Committee |
CLC/TC 82
|
| DocumentType |
Standard
|
| PublisherName |
European Committee for Standards - Electrical
|
| Status |
Current
|
| Standards | Relationship |
| DIN EN 62116:2014-11 | Identical |
| I.S. EN 62116:2014 | Identical |
| NBN EN 62116 : 2014 | Identical |
| CEI EN 62116 : 2015 | Identical |
| NF EN 62116 : 2014 | Identical |
| NEN EN IEC 62116 : 2014 | Identical |
| PN EN 62116 : 2014 | Identical |
| BS EN 62116:2014 | Identical |
| VDE 0126-2:2014-11 | Identical |
| IEC 62116:2014 | Identical |
| UNE-EN 62116:2014 V2 | Identical |
| UNE-EN 62116:2014 | Identical |