EN IEC 62746-10-3:2018
Withdrawn
Withdrawn
Systems interface between customer energy management system and the power management system - Part 10-3: Open automated demand response - Adapting smart grid user interfaces to the IEC common information model
Published date
10-26-2018
Withdrawn date
08-14-2021
Sorry this product is not available in your region.
IEC62746-10-3:2018 defines and describes methods and example XML artefacts that can be used to build a conformant adapter to enable interoperation between a utility distributed automation or demand response (DR) system based on the IEC common information model (CIM) and a utility smart grid user interface (SGUI) bridge standard (e.g.,IEC62746-10-1) to a customer facility. The scope is restricted to a method to define payload mappings between any specific CIM profile that contains DR/DER information models and the SGUI bridge standards including IEC62746-10-1.
| Committee |
CLC/SR 118
|
| DocumentType |
Standard
|
| ProductNote |
This standard is also refers to prEN 62746-10-1
|
| PublisherName |
European Committee for Standards - Electrical
|
| Status |
Withdrawn
|
| Standards | Relationship |
| BS EN IEC 62746-10-3:2018 | Identical |
| CEI EN IEC 62746-10-3 : 2019 | Identical |
| IEC 62746-10-3:2018 | Identical |
Summarise
Sorry this product is not available in your region.