ENA ER G5-4 : ISSUE 4 2001
Superseded
Superseded
View Superseded by
PLANNING LEVELS FOR HARMONIC VOLTAGE DISTORTION & THE CONNECTION OF NON-LINEAR EQUIPMENT TO TRANSMISSION SYSTEMS & DISTRIBUTION NETWORKS IN THE UNITED KINGDOM
Published date
01-12-2013
Publisher
Superseded date
07-23-2013
Superseded by
Sorry this product is not available in your region.
Gives the procedure for connecting single and three phase non-linear loads to PES supply networks. It contains connection limits in terms of plant loading for convertors and regulations, emission limits for Consumer's loads in terms of harmonic current, and total Harmonic Voltage Distortion planning limits for supply networks operating at 132 kV and below.
| DocumentType |
Standard
|
| PublisherName |
Energy Networks Association (UK)
|
| Status |
Superseded
|
| SupersededBy |
Summarise
Sorry this product is not available in your region.