• There are no items in your cart

GR 1241 CORE : ISSUE 7

Current

Current

The latest, up-to-date edition.

SUPPLEMENTAL SERVICE CONTROL POINT (SCP) GENERIC REQUIREMENTS

Published date

01-12-2013

Preface
1.Introduction
  1.1 Purpose and Scope
  1.2 Reason for Reissue
  1.3 Background
  1.4 Requirements Terminology
  1.5 Requirement Labeling Conventions
  1.6 Document Organization
  1.7 Applicability of Requirements
2.MTP Generic Requirements
  2.1 Signaling Links
  2.2 Processor Outage
  2.3 MTP Restart
  2.4 Load Sharing
  2.5 Congestion Control Improvements
  2.6 Cluster Routing and Management
  2.7 MTP-Level Timers
3.SCCP Generic Requirements
  3.1 SCCP Connectionless Signaling Procedures
  3.2 SCCP Connectionless Segmentation and Reassembly
  3.3 SCCP Management
  3.4 SCCP Hop Counter
4.Generalized Routing Procedures
  4.1 Scope and Applicability
  4.2 Definitions
  4.3 Overview
  4.4 Requirements for Features Using the GRP
  4.5 The Analysis Processing Units
  4.6 Additional SCCP Message Formatting Requirements
  4.7 Error Procedures
  4.8 Administrative Data
5.MRVT/SRVT
6.SCP CCS Interface Reliability
  6.1 SCP CCS Interface Downtime
  6.2 MTP Downtime Objectives
  6.3 MTP Hardware Downtime Requirements
Appendix A: Noncircuit-Related Message Formats
Appendix B: Primitives to Support Routing of TCAP Messages
Appendix C: Technical Description of INS
Appendix D: Operations Requirements for Section 4.8
Appendix E: Test Considerations for GRP
Appendix F: Changes Required to Support Extended Access Links (E-Links)
Appendix G: High-Speed Signaling Links (HSLs)
Appendix H: Support of SCCP/TCAP Signaling over IP
References
Glossary
Requirement-Object Index

Defines Telcordia's view of proposed generic requirements to support the following features for Service Control Point (SCP): Processor Outage, Load Sharing of traffic based on 8-bit Signalling Link Selection (SLS) codes, Congestion Control, Message Transfer Part (MTP) Restart, Signalling Connection Control Part (SCCP) Connectionless Segmentation and Reassembly, Cluster Routing and Management, Generalized Routing Procedures, MTP Routing Verification Test (MRVT) and SCCP Routing Verification Test (SRVT), SCP Common Channel Signalling (CCS) Interface Reliability and additional SCCP procedures.

DevelopmentNote
Included in FR CCS 18. (09/1999) Supersedes TR NWT 001241 (06/2002)
DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Current
Supersedes

GR 606 ILR : ISSUE 2A LSSGR: COMMON CHANNEL SIGNALING, SECTION 6.5
GR 82 ILR : ISSUE 2A SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS ISSUES LIST REPORT
GR 2878 CORE : ISSUE 4 GENERIC REQUIREMENTS FOR CCS NODES SUPPORTING ATM HIGH-SPEED SIGNALING LINKS (HSLS)
GR 2938 CORE : ISSUE 1 AINGR: SERVICE CONTROL POINT (SCP) NETWORK TRAFFIC MANAGEMENT
GR 1299 CORE : ISSUE 10 AINGR: SWITCH - SERVICE CONTROL POINT (SCP)/ADJUNCT INTERFACE

GR 82 CORE : ISSUE 15 SIGNALING TRANSFER POINT (STP) GENERIC REQUIREMENTS
GR 246 CORE : ISSUE 10 TELCORDIA TECHNOLOGIES SPECIFICATION OF SIGNALLING SYSTEM NUMBER 7
GR 1245 CORE : ISSUE 3 CCS NODE GENERIC REQUIREMENTS TO SUPPORT ROUTING VERIFICATION TESTS
TR NWT 001112 : ISSUE 1 BROADBAND ISDN USER TO NETWORK INTERFACE AND NETWORK NODE INTERFACE PHYSICAL LAYER GENERIC CRITERIA
GR 472 CORE : ISSUE 2 REV 2 OPERATIONS TECHNOLOGY GENERIC REQUIREMENTS (OTGR) SECTION 2.1: NETWORK ELEMENT CONFIGURATION MANAGEMENT
GR 1113 CORE : ISSUE 1 ASYNCHRONOUS TRANSFER MODE (ATM) AND ATM ADAPTATION LAYER (AAL) PROTOCOLS
TR NWT 000029 : ISSUE 1 SERVICE CONTROL POINT NODE GENERIC REQUIREMENTS FOR IN1
GR 1280 CORE : ISSUE 1 ADVANCED INTELLIGENT NETWORK (AIN) SERVICE CONTROL POINT (SCP) GENERIC REQUIREMENTS
GR 833 CORE : ISSUE 7 TL1 SURVEILLANCE AND MAINTENANCE MESSAGES
GR 2878 CORE : ISSUE 4 GENERIC REQUIREMENTS FOR CCS NODES SUPPORTING ATM HIGH-SPEED SIGNALING LINKS (HSLS)
GR 606 CORE : ISSUE 6 LSSGR: COMMON CHANNEL SIGNALING, SECTION 6.5
GR 3021 CORE : ISSUE 3 GENERIC REQUIREMENTS FOR CCS NODES SUPPORTING IP-BASED VIRTUAL HIGH-SPEED SIGNALLING LINKS (IPVHSLS)
GR 512 CORE : ISSUE 2 LSSGR: RELIABILITY, SECTION 12
GR 478 CORE : ISSUE 4 MEASUREMENTS AND DATA GENERATION
TR NWT 001229 : ISSUE 1 SIGNALING TRANSFER POINT, STORED PROGRAM CONTROLLED SWITCH, AND SERVICE CONTROL POINT NODE GENERIC REQUIREMENTS TO SUPPORT NODE RESTART

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.