I.S. EN 50518-2:2013
Withdrawn
View Superseded by
MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS
Hardcopy , PDF
English
01-01-2013
02-06-2022
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
7 Testing
8 Data
9 Data storage
10 Availability and verification of performance of
the ARC
11 Contingency plan
Annex A (normative) - ARC availability calculations
Bibliography
Defines the technical requirements of an ARC and also includes functional performance criteria and verification of performance.
| DevelopmentNote |
Supersedes I.S. 228. (02/2014)
|
| DocumentType |
Standard
|
| Pages |
17
|
| PublisherName |
National Standards Authority of Ireland
|
| Status |
Withdrawn
|
| SupersededBy | |
| Supersedes |
| Standards | Relationship |
| EN 50518-2:2013 | Identical |
| BS EN 50518-2:2013 | Equivalent |
| EN 50518-1:2013 | Monitoring and alarm receiving centre - Part 1: Location and construction requirements |
| EN 50136-1:2012 | Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems |
| EN 50518-3:2013 | Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation |
| CLC/TS 50136-4:2004 | Alarm systems - Alarm transmission systems and equipment - Part 4: Annunciation equipment used in alarm receiving centres |
| EN 50131-1:2006/A2:2017 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS |