• Shopping Cart
    There are no items in your cart
Meet Inform Select. Always-on access to the Standards your organisation relies on. Explore Inform Select

IEC 61850-7-410:2012

Superseded

Superseded

View Superseded by

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

Available format(s)

Hardcopy , PDF

Published date

10-30-2012

Superseded date

07-16-2026

Superseded by

IEC 61850-7-410:2026

US$542.00
Excluding Tax where applicable

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Committee
TC 57
DocumentType
Standard
Pages
159
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
EN 61850-7-410:2013 Identical
BS EN 61850-7-410:2013+A1:2016 Identical
UNE-EN 61850-7-410:2013 Identical

US$542.00
Excluding Tax where applicable