• Shopping Cart
    There are no items in your cart

IEC 62382:2006

Superseded

Superseded

View Superseded by

Electrical and instrumentation loop check

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

11-15-2006

Superseded date

12-31-2021

Superseded by

IEC 62382:2012

US$148.00
Excluding Tax where applicable

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Committee
TC 65/SC 65E
DocumentType
Standard
Pages
18
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy

Standards Relationship
UNE-EN 62382:2007 Identical
BS EN 62382:2007 Identical
UNE-EN 62382:2013 Identical

US$148.00
Excluding Tax where applicable