IEEE DRAFT 1082 : D12 APR 96
Superseded
View Superseded by
GUIDE FOR INCORPORATING HUMAN ACTION RELIABILITY ANALYSIS FOR NUCLEAR POWER GENERATING STATIONS
01-12-2013
05-01-1998
Clause
Forework
Committee List
1 Scope
2 Purpose
3 Definitions
4 Overview of an Integrated Human Reliability Analysis
4.1 Overall Evaluation Issues
4.1.1 PRA Compatibility
4.1.2 The Relationship of Approach to Results
4.1.3 Flexibility
4.1.4 Limits
4.2 The HRA Process
4.2.1 HRA Structure
4.2.2 The Steps
4.2.3 Outputs
5 Steps of the Process
5.1 Select and Train Team
5.1.1 Purpose
5.1.2 Description
5.1.3 Output
5.2 Familiarize Team with the Plant
5.2.1 Purpose
5.2.1 Description
5.2.3 Output
5.3 Build Initial Plant Model
5.3.1 Purpose
5.3.2 Description
5.3.3 Output
5.4 Screen Human Interactions
5.4.1 Purpose
5.4.2 Description
5.4.3 Output
5.5 Characterize Human Interaction Events
5.5.1 Purpose
5.5.2 Description
5.5.3 Output
5.6 Quantify Human Interaction Events
5.6.1 Purpose
5.6.2 Description
5.6.3 Output
5.6.4 Evaluate Additional Recoverability
5.6.5 Purpose
5.6.6 Description
5.6.7 Output
5.7 Update Plant Model
5.7.1 Purpose
5.7.2 Description
5.7.3 Output
5.8 Review Results
5.8.1 Purpose
5.8.2 Description
5.8.3 Output
Documentation
ANNEXES
Annex A Example data table (informative)
Annex B Bibliography (informative)
Gives a structured framework for the incorporation of human/system interactions into Probabilistic Risk Assessments.
| DocumentType |
Draft
|
| PublisherName |
Institute of Electrical & Electronics Engineers
|
| Status |
Superseded
|
| SupersededBy |