1 Overview
1.1 Scope
1.2 Purpose
1.3 Contractor qualification/certification
1.4 Site data
1.5 Equipment and services furnished by the Purchaser
1.6 Special tools furnished by the turnkey Contractor
1.7 Purchaser terms and conditions
2. General requirements
2.1 General description
2.2 Optional additional equipment and services by the Contractor
2.3 Miscellaneous equipment and services by the Contractor
2.4 Proposal data by the Contractor
2.5 Other considerations
2.6 References
2.7 Annex
Annex A: (informative) Design considerations
A.1 Project scope
A.2 Land use and environmental considerations
A.3 Aesthetic and environmental impact considerations
A.4 Permits and ordinances
A.5 Design criteria
A.6 Substation layout/bus design
A.7 Bus work
A.8 Grounding and shielding
A.9 Lighting and power outlets
A.10 Equipment
A.11 Construction
A.12 Quality assurance/quality control
A.13 Construction specifications
A.14 Testing and commissioning
A.15 Operation and maintenance, training
A.16 Documentation
Annex B (informative) Bibliograhpy
Guide covers the technical requirements to engineer, design, specify, fabricate, manufacture, furnish, install, test, commission and provide as-built documents for air insulated substations.
| DocumentType |
Draft
|
| PublisherName |
Institute of Electrical & Electronics Engineers
|
| Status |