ISA 5.2 : 1976
Superseded
Superseded
View Superseded by
BINARY LOGIC DIAGRAMS FOR PROCESS OPERATIONS
Published date
01-01-1976
Publisher
Superseded date
11-23-2024
Superseded by
Sorry this product is not available in your region.
1 Purpose
2 Scope
3 Use of Symbols
4 Symbols
5 Bibliography
Appendix A - General application example
Appendix B - Complex time-element example
Appendix C - Loss of power supply for memory
Gives a method of logic diagramming of binary interlock and sequencing systems for the startup, operation, alarm, and shutdown of equipment and processes in the chemical, petroleum, power generation, air conditioning, metal refining, and numerous other industries.
| Committee |
SP5.2
|
| DevelopmentNote |
Formerly it was ISA-S5.2 (05/2001) Supersedes ISA STDS & RP'S FOR INSTRUMENTATION. (07/2002)
|
| DocumentType |
Standard
|
| PublisherName |
International Society of Automation
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| API RP 554-3 : 2008 | PROCESS CONTROL SYSTEMS - PROJECT EXECUTION AND PROCESS CONTROL SYSTEM OWNERSHIP |
| CSA C22.4 No. 1 : 2009(R2018) | OBJECTIVE-BASED INDUSTRIAL ELECTRICAL CODE |
| ANS 59.2-1985 | NUCLEAR POWER PLANTS - HVAC SYSTEMS LOCATED OUTSIDE PRIMARY CONTAINMENT, SAFETY CRITERIA FOR, |
| ISA RP60.4 : 1990 | DOCUMENTATION FOR CONTROL CENTERS |
| API 554-3 : 2008 : R2016 | PROCESS CONTROL SYSTEMS - PROJECT EXECUTION AND PROCESS CONTROL SYSTEM OWNERSHIP |
| PIP PCEDO001 : 2015 | GUIDELINES FOR CONTROL SYSTEMS DOCUMENTATION |
| ANSI Y32.14 : LATEST | GRAPHIC SYMBOLS FOR LOGIC DIAGRAMS (TWO-STATE DEVICES) |
| NEMA ICS 1 : 2000(R2015) | INDUSTRIAL CONTROL AND SYSTEMS: GENERAL REQUIREMENTS |
Summarise
Sorry this product is not available in your region.