ISA RP16.5 : 1961
Withdrawn
Withdrawn
INSTALLATION, OPERATION, MAINTENANCE INSTRUCTIONS FOR GLASS TUBE VARIABLE AREA METERS (ROTAMETERS)
Available format(s)
PDF
Language(s)
English
Published date
06-30-1961
Publisher
Withdrawn date
08-31-2005
Excluding Tax where applicable
1 Purpose
2 History and development
3 Scope
4 Unpacking the instrument
5 Preparation of the instrument for installation
6 Installation
7 Start-up with by-pass arrangement
8 Water hammer
9 Maintenance
10 Reference
This Recommended Practice covers the general considerations important to the installation, operation and maintenance of meters to obtain the most reliable results.
| Committee |
8D-RP16
|
| DocumentType |
Standard
|
| ISBN |
0-87664-344-6
|
| Pages |
14
|
| PublisherName |
International Society of Automation
|
| Status |
Withdrawn
|
| API 551 : 2016 | PROCESS MEASUREMENT |
| UFC 3-430-11 : 2001 | UNIFIED FACILITIES CRITERIA - BOILER CONTROL SYSTEMS |
| PIP PCEFL001 : 2017 | FLOW MEASUREMENT GUIDELINES |
Summarise