• Shopping Cart
    There are no items in your cart

ISA RP16.5 : 1961

Withdrawn

Withdrawn

INSTALLATION, OPERATION, MAINTENANCE INSTRUCTIONS FOR GLASS TUBE VARIABLE AREA METERS (ROTAMETERS)

Available format(s)

PDF

Language(s)

English

Published date

06-30-1961

Withdrawn date

08-31-2005

1 Purpose
2 History and development
3 Scope
4 Unpacking the instrument
5 Preparation of the instrument for installation
6 Installation
7 Start-up with by-pass arrangement
8 Water hammer
9 Maintenance
10 Reference

This Recommended Practice covers the general considerations important to the installation, operation and maintenance of meters to obtain the most reliable results.

Committee
8D-RP16
DocumentType
Standard
ISBN
0-87664-344-6
Pages
14
PublisherName
International Society of Automation
Status
Withdrawn

API 551 : 2016 PROCESS MEASUREMENT
UFC 3-430-11 : 2001 UNIFIED FACILITIES CRITERIA - BOILER CONTROL SYSTEMS
PIP PCEFL001 : 2017 FLOW MEASUREMENT GUIDELINES