ISO 16484-1:2010
Withdrawn
View Superseded by
Building automation and control systems (BACS) — Part 1: Project specification and implementation
Hardcopy , PDF
English, French
10-27-2010
04-09-2025
ISO 16484-1:2010 specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).
ISO 16484-1:2010 specifies the phases required for the BACS project, including:
- design (determination of project requirements and production of design documents including technical specifications),
- engineering (detailed function and hardware design),
- installation (installing and commissioning of the BACS), and
- completion (handover, acceptance and project finalization).
ISO 16484-1:2010 also specifies the requirements for as-built documentation and training.
ISO 16484-1:2010 is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.
| Committee |
ISO/TC 205
|
| DevelopmentNote |
Supersedes ISO/DIS 16484-1. (10/2010)
|
| DocumentType |
Standard
|
| Pages |
24
|
| PublisherName |
International Organization for Standardization
|
| Status |
Withdrawn
|
| SupersededBy | |
| UnderRevision |
| Standards | Relationship |
| NBN EN ISO 16484-1 : 2010 | Identical |
| NEN EN ISO 16484-1 : 2010 | Identical |
| NS EN ISO 16484-1 : 2010 | Identical |
| I.S. EN ISO 16484-1:2010 | Identical |
| PN EN ISO 16484-1 : 2012 | Identical |
| BS EN ISO 16484-1:2010 | Identical |
| EN ISO 16484-1:2010 | Identical |
| NF EN ISO 16484-1 : 2012 | Identical |
| DIN EN ISO 16484-1:2011-03 | Identical |
| DS EN ISO 16484-1 : 2010 | Identical |
| UNE-EN ISO 16484-1:2011 | Identical |
A newer version of this standard is available.