JIS C 4411-2:2007
Withdrawn
Withdrawn
View Superseded by
Uninterruptible power systems (UPS) -- Part 2: Electromagnetic compatibility (EMC) requirements
Published date
06-01-2007
Publisher
Withdrawn date
10-23-2025
Superseded by
Sorry this product is not available in your region.
| DocumentType |
Standard
|
| PublisherName |
Japanese Standards Association
|
| Status |
Withdrawn
|
| SupersededBy |
2007(R2012) [22/10/2012]2007 [20/05/2007]2003 [20/06/2003]
| JIS C 61000-4-3:2005 | Electromagnetic compatibility (EMC) -- Part 4-3: Testing and measurement techniques -- Radiated, radio-frequency, electromagnetic field immunity test |
| JIS C 61000-3-2:2005 | Electromagnetic compatibility (EMC) -- Part 3-2: Limits -- Limits for harmonic current emissions (equipment input current Part 3-2: Limits - Limits for harmonic current emissions (equipment input current <= 20A per phase) |
| JIS C 61000-4-2:1999 | Electromagnetic compatibility (EMC) -- Part 4: Testing and measurement techniques -- Section 2: Electrostatic discharge immunity test |
| JIS C 61000-4-4:2007 | Electromagnetic compatibility (EMC) -- Part 4-4: Testing and measurement techniques -- Electrical fast transient/burst immunity test |
| JIS C 4411-3:2004 | Uninterruptible power systems (UPS) -- Part 3: Method of specifying the performance and test requirements Part 3: Method of specifying the performance and test requirements |
| JIS C 60050-161:1997 | International Electrotechnical Vocabulary: Electromagnetic compatibility |
| JIS C 61000-4-6:2006 | Electromagnetic compatibility (EMC) -- Part 4-6: Testing and measurement techniques -- Immunity to conducted disturbances, induced by radio-frequency fields |
| JIS C 61000-4-8:2003 | Electromagnetic compatibility (EMC) -- Part 4: Testing and measurement techniques -- Section 8: Power-frequency magnetic field immunity test |
| JIS C 61000-4-5:1999 | Electromagnetic compatibility (EMC) -- Part 4: Testing and measurement techniques -- Section 5: Surge immunity test |
| JIS C 4411-3:2004 | Uninterruptible power systems (UPS) -- Part 3: Method of specifying the performance and test requirements Part 3: Method of specifying the performance and test requirements |
| TS C 0043-1:2006 | Uninterruptible power systems (UPS) -- Part 1: General and safety requirements for UPS used in operator access areas |
| TS C 0043-2:2006 | Uninterruptible power systems (UPS) -- Part 2: General and safety requirements for UPS used in restricted access areas |
Summarise
Sorry this product is not available in your region.