MIL C 81974 : 0
Withdrawn
Withdrawn
Sorry this product is not available in your region.
Outlines all requirements for Composition, Starter.
| Committee |
FSC 1370
|
| DocumentType |
Standard
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Withdrawn
|
| PPP-C-96 Revision E:1992 | Cans, Metal, 28 Gage and Lighter |
| MIL-STD-129 Revision R:2014 | Military Marking for Shipment and Storage |
| MIL-I-45607 Revision C:1987 | Inspection Equipment, Acquisition, Maintenance and Disposition of |
| PPP-D-705 Revision E:1994 | Drum, Shipping and Storage: Steel, 16 and 30 Gallon Capacity (Future acquisitions for this material should refer to MIL-DTL-6054) |
| MIL-STD-1234 Base Document:1962 | Pyrotecnics: Sampling, Inspection and Testing |
| MIL-L-376 Revision C:1983 | Lead, Dioxide, Technical |
| MIL C 45662 : 0 | CALIBRATION SYSTEM REQUIREMENTS |
| PPP-P-704 Revision E:1981 | Pails, Metal: (Shipping, Steel, 1 through 12 Gallons) |
| MIL-C-13600 Revision A:1962 | Cupric Oxide (S/S by A-A-59122) |
| MIL-S-230 Revision C:1983 | Silicon, Powdered, Technical |
Summarise
Sorry this product is not available in your region.