• Shopping Cart
    There are no items in your cart

MIL-P-63140 Revision A:1980

Withdrawn

Withdrawn

Projectile, 8-Inch, HE, RA, M650 Delay Assembly for (No S/S Document)

Available format(s)

PDF

Language(s)

English

Published date

03-24-1980

Withdrawn date

06-03-1996

US$20.00
Excluding Tax where applicable

Requirements and quality assurance criteria for delay assembly for 8-inch rocket-assisted projectile, M650.

DocumentType
Standard
Pages
48
PublisherName
US Military Specs/Standards/Handbooks
Status
Withdrawn

This specification contains requirements not covered by the drawings and provides quality assurance provisions for the delay assembly for the 8-Inch Rocket-Assisted Projectile, M650.

ASTM B 430 : 1997 Standard Test Method for Particle Size Distribution of Refractory Metal Powders and Related Compounds by Turbidimetry
MIL-T-48140 Base Document:1973 Tungsten Powder (For Pyrotechnics)
MIL-STD-410 Revision E:1991 NONDESTRUCTIVE TESTING PERSONNEL QUALIFICATION AND CERTIFICATION (SEE NAS410 AS A POSSIBLE REPLACEMENT)
MIL M 382 : C MAGNESIUM POWDER [FOR USE IN AMMUNITION]
MIL-STD-414 Base Document:1957 SAMPLING PROCEDURE AND TABLE FOR INSPECTION BY VARIABLES FOR PERCENT DEFECTIVE (S/S BY ASQC-Z1.9)
MIL-STD-1234 Base Document:1962 Pyrotecnics: Sampling, Inspection and Testing
MIL-STD-453 Revision C:1984 Inspection, Radiographic (S/S By ASTM-E1742)
MIL-V-50433 Base Document:1969 Vinyl Alcohol - Acetate Resin Solution (VAAR) (for use in Ammunition)
MIL-A-48078 Revision A:1988 Ammunition, Standard Quality Assurance Provisions, General Specification for

US$20.00
Excluding Tax where applicable