MIL-S-50218 Revision B:1978
Withdrawn
Switch, Nose Crush Assembly, Assembling and Packing (Dragon) (No S/S Document)
English
02-13-1978
06-01-1996
Covers requirements not covered by the drawings and provides quality assurance provisions for the fabrication of parts assembly and packing of nose crush switch.
| DocumentType |
Standard
|
| Pages |
29
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Withdrawn
|
This specification contains requirements not covered by the drawings and provides quality assurance provisions for the fabrication of parts, assembly and packing of one type of nose crush switch.
| MIL STD 1460 : NOTICE 2 | SOLDERING OF ELECTRICAL CONNECTIONS AND PRINTED WIRING ASSEMBLIES, PROCEDURE FOR |
| MIL-STD-1169 Revision B:1987 | PACKAGING, PACKING AND MARKING FOR SHIPMENT OF INERT AMMUNITION COMPONENTS (S/S BY ASTM-D3951) |
| MIL C 5541 : E | CHEMICAL CONVERSION COATINGS ON ALUMINUM AND ALUMINUM ALLOYS |
| MIL-A-48078 Revision A:1988 | Ammunition, Standard Quality Assurance Provisions, General Specification for |
| MIL-E-45782 Revision C:1993 | Electrical Wiring, Procedures for |