1. INTRODUCTION
2. RIDM PROCESS INTERFACES
3. THE RIDM PROCESS
4. SETTING THE STAGE FOR CRM
5. REFERENCES
APPENDIX A: NPR 8000.4A Requirements Cross-Reference
APPENDIX B: ACRONYMS AND ABBREVIATIONS
APPENDIX C: DEFINITIONS
APPENDIX D: Content Guide for the Technical Basis for
Deliberation
APPENDIX E: Content Guide for the Risk-Informed Selection
Report
APPENDIX F: Selected NASA Examples of RIDM Process Elements
Specifies guidance for implementing the risk-informed decision making (RIDM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements, with a specific focus on programs and projects in the Formulation phase, and applying to each level of the NASA organizational hierarchy as requirements flow down.
| DocumentType |
Standard
|
| PublisherName |
National Aeronautics and Space Administration
|
| Status |
Withdrawn
|
| NASA SP 3421 : 2011 | PROBABILISTIC RISK ASSESSMENT PROCEDURES GUIDE FOR NASA MANAGERS AND PRACTITIONERS |
| NASA MSFC HDBK 3684 : 2013 | PROJECT PLANNING AND CONTROL HANDBOOK |
| NASA STD 7009 : 2016 | STANDARD FOR MODELS AND SIMULATIONS |
| NASA SP 569 : 2009 | BAYESIAN INFERENCE FOR NASA PROBABILISTIC RISK AND RELIABILITY ANALYSIS |