NBR 7187 : 2003
Withdrawn
Withdrawn
View Superseded by
DESIGN OF REINFORCED AND PRESTRESSED CONCRETE BRIDGES - PROCEDURE
Published date
01-12-2013
Publisher
Withdrawn date
07-21-2021
Superseded by
Sorry this product is not available in your region.
Fixa condicoes gerais para o projeto, execucao e controle de pontes de concreto armado ou protendido, excluidas aquelas em que se empregue concreto leve ou outros concretos especiais.
| Committee |
CB-02
|
| DocumentType |
Standard
|
| PublisherName |
Brazilian Standards
|
| Status |
Withdrawn
|
| SupersededBy |
| NBR 7188 : 2013 | ROAD AND PEDESTRIAN LIVE LOAD ON BRIDGES, VIADUCTS, FOOTBRIDGES AND OTHER STRUCTURES |
| NBR 6123 : 1988 ERRATA 2 2013 | BUILDING CONSTRUCTION - BASES FOR DESIGN OF STRUCTURES - WIND LOADS - PROCEDURE |
| NBR 7188 : 2013 | ROAD AND PEDESTRIAN LIVE LOAD ON BRIDGES, VIADUCTS, FOOTBRIDGES AND OTHER STRUCTURES |
| NBR 8681 : 2003 ERRATA 2004 | ACTIONS AND SAFETY OF STRUCTURES - PROCEDURE |
| NBR 12655 : 2015 ERRATA 1 2015 | PORTLAND CEMENT CONCRETE - PREPARATION, CONTROL, RECEIPT AND ACCEPTANCE - PROCEDURE |
Summarise
Sorry this product is not available in your region.