NEN 10965 : 1989
Withdrawn
Withdrawn
SUPPLEMENTARY CONTROL POINTS FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM
Published date
01-12-2013
Publisher
Withdrawn date
10-26-2011
Sorry this product is not available in your region.
Establishes the requirements for Supplementary Control Points (SCP) provided to enable the operating staff to shut down the reactor and maintain the plant in a safe shut-down condition when the main control room is no longer available.
| DocumentType |
Standard
|
| PublisherName |
Netherlands Standards
|
| Status |
Withdrawn
|
| Standards | Relationship |
| IEC 60965:2016 | Identical |
Summarise
Sorry this product is not available in your region.