NEN EN ISO/IEC 199646-5 : 1996
Current
The latest, up-to-date edition.
INFORMATION TECHNOLOGY - OPEN SYSTEMS INTERCONNECTION -CONFORMANCE TESTING METHODOLOGY AND FRAMEWORK - PART 5: REQUIREMENTS ON TEST LABORATORIES AND CLIENTS FOR THE CONFORMANCE ASSESSMENT PROCESS
01-12-2013
Foreword
Introduction
1 Scope
2 Normative references
3 Definitions
4 Abbreviations
5 Overview of the conformance assessment process
5.1 Introduction
5.2 Preparation for testing
5.3 Test operations
5.4 Test report production
6 Preparation for testing
6.1 Introduction
6.2 Requirements for testability of the System
Under Test
6.3 Communication between the test laboratory and
the client
6.4 Documentation for conformance assessment
7 Test operations
7.1 Introduction
7.2 Static conformance review
7.3 Test selection
7.4 Test parameterization
7.5 Verification of Test Coordination Procedures
7.6 Test campaign
7.7 Negotiated exits during the test campaign
8 Test report production
8.1 Conformance test reports
8.2 System Conformance Test Report (SCTR)
8.3 Protocol Conformance Test Report (PCTR)
9 Compliance
9.1 Test laboratory role
9.2 Client role
Annex
A System Conformance Test Report (SCTR) template
A.1 Introduction
A.2 Conformance
A.3 SCTR proforma
B Protocol Conformance Test Report (PCTR) template
B.1 Introduction
B.2 Conformance
B.3 PCTR proforma
C Skeleton IXIT Proforma
C.1 Introduction
C.2 IXIT proforma
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.