PREN 16432-1 : DRAFT 2017
Superseded
RAILWAY APPLICATIONS - BALLASTLESS TRACK SYSTEMS - PART 1: GENERAL REQUIREMENTS
01-12-2013
07-01-2017
European foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and abbreviations
5 External actions
6 System requirements
Annex A (informative) - Rail temperature increase
by using eddy current brake
Annex B (informative) - Examples of loop-free and
zones with limited metal content to ensure EMC
Annex C (informative) - Example of balise mounting
system
Annex ZA (informative) - Relationship between this
European Standard and the Essential
Requirements of EU Directive 2008/57/EC
Bibliography
Describes the general requirements concerning the design of ballastless track systems.
| Committee |
TC 256
|
| DocumentType |
Draft
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Superseded
|
| Standards | Relationship |
| DIN EN 16432-1:2015-04 (Draft) | Identical |
| 12/30259982 DC : 0 | Identical |
| 17/30331222 DC : 0 | Identical |
| 15/30270279 DC : 0 | BS EN 16432-2 - RAILWAY APPLICATIONS - BALLASTLESS TRACK SYSTEMS - PART 2: SUBSYSTEMS AND COMPONENTS |