PREN 2349-312 : 200P1
Withdrawn
Withdrawn
View Superseded by
AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 312: ELECTRICAL SERVICE LIFE - MIXED LOAD
Available format(s)
Hardcopy , PDF
Language(s)
English
Withdrawn date
12-07-2023
Superseded by
US$53.45
Excluding Tax where applicable
1 Scope
2 Normative references
3 Mounting method
4 Test procedures
5 Test criteria
6 Verification tests
Specifies a method for testing the electrical service life - mixed load of relays and contactors.
| Committee |
C2
|
| DevelopmentNote |
To be used together with EN 2349-100. (07/2003)
|
| DocumentType |
Draft
|
| Pages |
5
|
| ProductNote |
Superseded by EN 2349-312:2006
|
| PublisherName |
Aerospace & Defence Industries Association of Europe
|
| Status |
Withdrawn
|
| SupersededBy |
| Standards | Relationship |
| DIN EN 2349-312:2007-05 | Identical |
| PREN 2349-303 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 303: DIELECTRIC STRENGTH |
| PREN 2349-412 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 412: SEAL |
| PREN 2349-302 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 302: INSULATION RESISTANCE |
| PREN 2349-307 : 200P1 | AEROSPACE SERIES - REQUIREMENTS AND TEST PROCEDURES FOR RELAYS AND CONTACTORS - PART 307: CONTACT VOLTAGE DROP |
Summarise
US$53.45
Excluding Tax where applicable