• Shopping Cart
    There are no items in your cart

TA TSY 000844 : ISSUE 1

Superseded

Superseded

View Superseded by

TSC/RTU FUNCTIONAL REQUIREMENTS FOR GENERIC LOOP TESTING COMMANDS

Published date

01-12-2013

Superseded date

11-01-1995

Superseded by

GR 844 CORE : ISSUE 2

Sorry this product is not available in your region.

Bellcore's preliminary view of the Test System Controller/Remote Test Unit functional requirements for the Test System Controller/Remote Test Unit functional requirements for the test commands supported by the generic loop test system interface specified in TA-TSY-000202 (Specification of Loop Testing Messages at the OS/Test System Controller Interface). TA-TSY-000844 contains requirements relating to basic test measurements, analysis of test results, system thresholds, testing effects of equipment and test command responses

DocumentType
Standard
PublisherName
Telcordia Technologies
Status
Superseded
SupersededBy

Sorry this product is not available in your region.