Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

AS 2629-1983

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Separable insulated connectors for power distribution systems above 1 kV

Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English

Published date

04-07-1983

Superseded date

30-06-2017

Superseded by

AS 2629-2008

$109.95
Including GST where applicable

1 - AS 2629-1983 SEPARABLE INSULATED CONNECTORS FOR POWER DISTRIBUTION SYSTEMS ABOVE 1 kV
4 - PREFACE
5 - CONTENTS
6 - SECTION 1. SCOPE AND GENERAL
6 - 1.1 SCOPE.
6 - 1.2 REFERENCED DOCUMENTS.
6 - 1.3 SERVICE CONDITIONS.
7 - SECTION 2. DEFINITIONS
7 - 2.1 APPLICATION OF SECTION.
7 - 2.2 GENERAL TERMS.
7 - 2.3 HARDWARE ITEMS.
7 - 2.4 ELECTRICAL CHARACTERISTICS.
12 - SECTION 3. RATINGS
12 - 3.1 VOLTAGE RATINGS.
12 - 3.2 RATED FREQUENCY.
12 - 3.3 CURRENT RATINGS.
13 - SECTION 4. DESIGN, CONSTRUCTION AND MARKING
13 - 4.1 DESIGN.
13 - 4.2 INTERCHANGEABILITY.
13 - 4.3 OPERATING MEANS.
13 - 4.4 SHIELDING.
13 - 4.5 TEST POINTS.
13 - 4.6 HOLD-DOWN BAILS.
13 - 4.7 MARKING.
25 - SECTION 5. PERFORMANCE
25 - 5.1 BEHAVIOUR ON TEST AND IN SERVICE.
25 - 5.2 OPERATING TEMPERATURE OF MATERIALS.
26 - SECTION 6. CLASSIFICATION OF TESTS
26 - 6.1 TYPE TESTS.
26 - 6.2 ROUTINE TESTS.
26 - 6.3 TESTS AT SITE.
28 - SECTION 7. DETAILS OF TYPE TESTS
28 - 7.1 DIELECTRIC TESTS.
28 - 7.2 SHORT-CIRCUIT CURRENT-CARRYING CAPABILITY TEST.
28 - 7.3 SWITCHING-CURRENT TESTS
29 - 7.4 SHORT-CIRCUIT MAKING CURRENT TEST
29 - 7.5 CONNECTOR ELBOW DISTORTION TEST FOR OFF-AXIS FORCE
32 - 7.6 CURRENT-CYCLING TEST.
33 - 7.7 CABLE PULL-OUT TEST.
33 - 7.8 OPERATING FORCE TEST.
33 - 7.9 OPERATING EYE TEST.
33 - 7.10 TEST-POINT CAP MECHANICAL TEST.
33 - 7.11 TEST-POINT ELECTRICAL TESTS.
33 - 7.12 SHIELDING TEST.
33 - 7.13 ACCELERATED SEALING LIFE TEST.

Applies to connectors, load-break up to 200 A and dead-break up to 1200 A, for use on power distribution systems at alternating voltages above 1 kV to 36 kV. Includes illustrations of system components and dimensioned drawings for the range of connection interfaces specified.

Committee
EL-007
DocumentType
Standard
ISBN
0 7262 3004 9
Pages
29
PublisherName
Standards Australia
Status
Superseded
SupersededBy
Supersedes

This standard specifies requirements for load-break and dead-break separable insulated connectors and ancillary equipment for use on power distribution systems at alternating voltages above 1 kV.The standard applies to separable insulated connectors rated at not more than 1250 A.NOTE: Load-break connectors are available only for the lower current ratings. The purchaser should obtain information from manufacturers on available current ratings.

AS/NZS 1429.1:2006 Electric cables - Polymeric insulated For working voltages 1.9/3.3 (3.6) kV up to and including 19/33 (36) kV (Reconfirmed 2017)
AS 1931.1-1996 High-voltage test techniques - General definitions and test requirements
AS 1018-1985 Partial discharge measurements

$109.95
Including GST where applicable