Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IEC TS 61400-26-1:2011

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems

Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English, Spanish, Castilian

Published date

14-11-2011

Superseded date

31-12-2021

Superseded by

IEC 61400-26-1:2019

$714.89
Including GST where applicable

FOREWORD
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model
5 INFORMATION AVAILABLE
6 INFORMATION UNAVAILABLE
Annex A (informative) - Optional information
        categories - examples
Annex B (informative) - Time based availability
        indicators - examples
Annex C (informative) - Verification scenarios - examples
Bibliography

IEC 61400-26-1:2011(E) defines generic information categories to which fractions of time can be assigned for a wind turbine generating system (WTGS) considering internal and external conditions based on fraction of time and specifying the following:
- generic information categories of a WTGS considering availability and other performance indicators;
- information category priority in order to discriminate between concurrent categories;
- entry and exit point for each information category in order to allocate designation of time;
- informative annexes providing various examples.

Committee
TC 88
DevelopmentNote
Stability Date: 2017. (09/2017)
DocumentType
Technical Specification
Pages
53
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy

CLC/TS 61400-26-3:2017 Wind energy generation systems - Part 26-3: Availability for wind power stations
PD ISO/TR 21245-1:2016 Railway applications. Rail project planning process Stakeholders and their needs/interests
I.S. EN 61400-25-2:2015 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
BS EN 61400-25-2:2015 Wind turbines Communications for monitoring and control of wind power plants - Information models
S.R. CLC/TS 61400-26-2:2017 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
PD CLC/TS 61400-26-2:2017 Wind turbines Production-based availability for wind turbines
IEC TS 61400-26-2:2014 Wind turbines - Part 26-2: Production-based availability for wind turbines
CLC/TS 61400-26-2:2017 Wind turbines - Part 26-2: Production-based availability for wind turbines
BS PD IEC TS 61400-26-2 : 2014 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
S.R. CLC/TS 61400-26-3:2017 WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
IEC TS 61400-26-3:2016 Wind energy generation systems - Part 26-3: Availability for wind power stations
PD CLC/TS 61400-26-3:2017 Wind energy generation systems Availability for wind power stations
PD IEC/TS 61400-26-3:2016 Wind energy generation systems Availability for wind power stations
NF EN 61400-25-2 : 2016 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
EN 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models

IEC 60050-415:1999 International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems
IEEE 762-2006 IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
ISO 3977-9:1999 Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements

$714.89
Including GST where applicable