Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

S.R. CLC/TS 61400-26-3:2017

Current

Current

The latest, up-to-date edition.

WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2017

$280.56
Including GST where applicable

National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model for WPS
5 INFORMATION AVAILABLE (WPS)
6 INFORMATION UNAVAILABLE (WPS)
Annex A (informative) - Entry and Exit condition overview
Annex B (informative) - Application scenarios - examples
Annex C (informative) - Balance of plant integration
Annex D (informative) - Determination of potential production
        for a WPS - examples
Annex E (informative) - Service availability indicators - examples
Annex F (informative) - Examples of optional level 5 categories
Bibliography
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

Defines a framework from which time-based and production-based availability indicators of a wind power station can be derived.

DevelopmentNote
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (09/2017)
DocumentType
Standard
Pages
132
PublisherName
National Standards Authority of Ireland
Status
Current
SupersededBy

Standards Relationship
CLC/TS 61400-26-3:2017 Identical

IEC 60050-415:1999 International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems
CLC/TS 61400-26-2:2017 Wind turbines - Part 26-2: Production-based availability for wind turbines
IEC 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
IEEE 762-2006 IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
IEC TS 61400-26-2:2014 Wind turbines - Part 26-2: Production-based availability for wind turbines
ISO 3977-9:1999 Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety
IEC TS 61400-26-1:2011 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
CLC/TS 61400-26-1:2017 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements
IEC 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing

$280.56
Including GST where applicable