ANSI C50.10 : 1990
Withdrawn
Withdrawn
ROTATING ELECTRICAL MACHINERY - SYNCHRONOUS MACHINES
Published date
01-12-2013
Publisher
Withdrawn date
07-23-2013
Sorry this product is not available in your region.
The requirements for machines with excitation windings are covered as follows: ANSR for Cylindrical Rotor Synchronous Generators, C50.10-1977. ANSR for Cylindrical Rotor Synchronous Generators, C50.13-1977. ANSR for Combustion Gas Turbine Driven Synchronous Generators C50.14-1977. This standard applies to all types of 60 Hz synchronous machines except fractional horse-power motors. Requirements for cylindrical rotor synchronous generators and combustion gas turbine driven synchronous generators will be found in ANSI C50.13-1977 AND C50.14-1977.
| Committee |
ANSI
|
| DocumentType |
Standard
|
| PublisherName |
American National Standards Institute
|
| Status |
Withdrawn
|
| IEEE 141 : 1993 | IEEE Recommended Practice for Electric Power Distribution for Industrial Plants |
| MIL-HDBK-705 Revision C:1987 | Generator Sets, Electrical, Measurement and Instrument and Instrumentation Methods (S/S by MIL-STD-705) |
| IEEE DRAFT 387 : D9A MAR 95 | DRAFT STANDARD CRITERIA FOR DIESEL-GENERATOR UNITS APPLIED AS STANDBY POWER SUPPLIES FOR NUCLEAR POWER GENERATING STATIONS |
| IEEE DRAFT 1147 : D8 2005 | GUIDE FOR THE REHABILITATION OF HYDROELECTRIC POWER PLANTS |
| MIL-G-19826 Revision F:1984 | Generator Set, Diesel Engine, Alternating Current , for Facilities Construction; 10 KW Through 1000 KW (Not Stocked) (S/S By CC-G-2745) |
| CC-G-2745 Base Document:1984 | GENERATOR SETS, DIESEL ENGINE, ALTERNATING CURRENT, FOR FACILITIES CONSTRUCTION; 10 KW THROUGH 1000 KW (NOT STOCKED) (NO S/S DOCUMENT) |
| IEEE DRAFT 1248 : D7 97 | DRAFT GUIDE FOR THE COMMISSIONING OF ELECTRICAL SYSTEMS IN HYDROELECTRIC POWER PLANTS |
| IEEE DRAFT C62.92.2 : 1999 | DRAFT GUIDE FOR THE APPLICATION OF NEUTRAL GROUNDING IN ELECTRICAL UTILITY SYSTEMS, PART 2 - GROUNDING OF SYNCHRONOUS GENERATOR SYSTEMS |
| NEMA CC1 : 2009(R2015) | ELECTRIC POWER CONNECTORS FOR SUBSTATIONS |
| IEEE 387-1995 | IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations |
| IEEE C37.101-2006 REDLINE | IEEE Guide for Generator Ground Protection |
| API 11PGT : 1992 | RECOMMENDED PRACTICE FOR PACKAGED COMBUSTION GAS TURBINES |
| IEEE DRAFT C37.102 : D8 2006 | AC GENERATOR PROTECTION |
| IEEE 95-2002 | IEEE Recommended Practice for Insulation Testing of AC Electric Machinery (2300 V and Above) With High Direct Voltage |
| IEEE C37.102-2006 REDLINE | IEEE Guide for AC Generator Protection |
| IEEE 421B-1979 | IEEE Standard for High-Potential-Test Requirements for Excitation Systems for Synchronous Machines |
| IEEE C62.92.2-1989 | IEEE Guide for the Application of Neutral Grounding in Electrical Utility Systems, Part II - Grounding of Synchronous Generator Systems |
| IEEE DRAFT 1010 : D10 2005 | GUIDE FOR CONTROL OF HYDROELECTRIC POWER PLANTS |
| IEEE 1147-2005 | IEEE Guide for the Rehabilitation of Hydroelectric Power Plants |
| IEEE C50.13-2014 | IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above |
| IEEE DRAFT C37.96 : D5 99 | DRAFT GUIDE FOR AC MOTOR PROTECTION |
| ANSI C50.12 : 2005 | SYNCHRONOUS GENERATORS AND GENERATOR/MOTORS FOR HYDRAULIC TURBINE APPLICATIONS, REQUIREMENTS FOR SALIENT POLE SYNCHRONOUS |
| IEEE C50.13-2014 | IEEE Standard for Cylindrical-Rotor 50 Hz and 60 Hz Synchronous Generators Rated 10 MVA and Above |
Summarise
Sorry this product is not available in your region.