• Shopping Cart
    There are no items in your cart

API 582 REDLINE : 2009

Superseded

Superseded

View Superseded by

WELDING GUIDELINES FOR THE CHEMICAL, OIL, AND GAS INDUSTRIES

Published date

01-01-2009

Superseded date

07-23-2023

Superseded by

API RP 582:2023

Sorry this product is not available in your region.
Summarise this standard

1 Scope
2 Normative References
3 Definitions
4 General Welding Requirements
5 Welding Processes
6 Welding Consumables (Filler Metal and Flux)
7 Shielding and Purging Gases
8 Preheating and Interpass Temperature
9 Post Weld Heat Treatment (PWHT)
10 Cleaning and Surface Preparation
11 Special Procedure Qualification Requirements/Testing
12 Other Items
Annex A (informative) - Welding Consumables for Shielded
        Metal Arc Welding (SMAW)
Annex B (normative) - Weld Overlay and Clad Restoration
        (Back Cladding)

Specifies supplementary guidelines and practices for welding and welding related topics for shop and field fabrication, repair and modification of the following: a) pressure-containing equipment such as pressure vessels, heat exchangers, piping, heater tubes, and pressure boundaries of rotating equipment and attachments welded thereto; b) tanks and attachments welded thereto; c) nonremovable internals for process equipment; d) structural items attached and related to process equipment; and e) other equipment or component item when referenced by an applicable purchase document.

DocumentType
Redline
PublisherName
American Petroleum Institute
Status
Superseded
SupersededBy

Sorry this product is not available in your region.