API 752 REDLINE : 2009
Withdrawn
Withdrawn
MANAGEMENT OF HAZARDS ASSOCIATED WITH LOCATION OF PROCESS PLANT PERMANENT BUILDINGS
Published date
01-01-2009
Publisher
Withdrawn date
02-01-2024
Sorry this product is not available in your region.
1 Scope
2 Normative References
3 Terms and Definitions
4 Determination of Buildings Requiring Building Siting
Evaluation
5 Building Siting Evaluation Processes
6 Building Siting Evaluation for Explosion
7 Building Siting Evaluation for Fire
8 Building Siting Evaluation for Toxic Material Release
Annex A (informative) - Examples
Bibliography
Gives guidance for managing the risk from explosions, fires and toxic material releases to on-site personnel located in new and existing buildings intended for occupancy.
| DocumentType |
Redline
|
| PublisherName |
American Petroleum Institute
|
| Status |
Withdrawn
|
| PIP STC01018 : 2014 | BLAST RESISTANT BUILDING DESIGN CRITERIA |
| ASHRAE 62.1 : 2016 | VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY |
| CFR 29(PT1910.1000 TO END) : 0 | LABOR - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR |
| UFC 3-340-02 : Change 2 | UNIFIED FACILITIES CRITERIA - STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL EXPLOSIONS |
Summarise
Sorry this product is not available in your region.