• Shopping Cart
    There are no items in your cart

API 752 REDLINE : 2009

Withdrawn

Withdrawn

MANAGEMENT OF HAZARDS ASSOCIATED WITH LOCATION OF PROCESS PLANT PERMANENT BUILDINGS

Published date

01-01-2009

Withdrawn date

02-01-2024

Sorry this product is not available in your region.

1 Scope
2 Normative References
3 Terms and Definitions
4 Determination of Buildings Requiring Building Siting
  Evaluation
5 Building Siting Evaluation Processes
6 Building Siting Evaluation for Explosion
7 Building Siting Evaluation for Fire
8 Building Siting Evaluation for Toxic Material Release
Annex A (informative) - Examples
Bibliography

Gives guidance for managing the risk from explosions, fires and toxic material releases to on-site personnel located in new and existing buildings intended for occupancy.

DocumentType
Redline
PublisherName
American Petroleum Institute
Status
Withdrawn

PIP STC01018 : 2014 BLAST RESISTANT BUILDING DESIGN CRITERIA
ASHRAE 62.1 : 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
CFR 29(PT1910.1000 TO END) : 0 LABOR - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
UFC 3-340-02 : Change 2 UNIFIED FACILITIES CRITERIA - STRUCTURES TO RESIST THE EFFECTS OF ACCIDENTAL EXPLOSIONS

Sorry this product is not available in your region.