• Shopping Cart
    There are no items in your cart

BS EN 50518-1:2010

Superseded

Superseded

View Superseded by

Monitoring and alarm receiving centre Location and construction requirements

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

09-30-2011

Superseded date

02-08-2023

Superseded by

BS EN 50518-1:2013

US$341.23
Excluding Tax where applicable

Committee
GW/1/11
DocumentType
Standard
Pages
24
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Standards Relationship
EN 50518-1:2010 Identical
I.S. EN 50518-1:2010 Equivalent
EN 50518-1:2010 Equivalent

US$341.23
Excluding Tax where applicable