• Shopping Cart
    There are no items in your cart

EN 50518-1:2010

Withdrawn

Withdrawn

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Published date

04-16-2010

Withdrawn date

04-01-2013

Sorry this product is not available in your region.

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Withdrawn

Standards Relationship
BS EN 50518-1:2010 Equivalent
I.S. EN 50518-1:2010 Equivalent
UNE-EN 50518-1:2011 Identical
BS EN 50518-1:2010 Identical

Sorry this product is not available in your region.