I.S. EN 50518-3:2013
Withdrawn
MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
Hardcopy , PDF
English
01-01-2013
02-06-2022
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Staffing
5 Operating procedures
6 Audit
7 Complaints procedure
8 Data
Bibliography
Describes the minimum procedures and requirements for the operation of an ARC.
| DevelopmentNote |
Supersedes I.S. 228. (02/2014)
|
| DocumentType |
Standard
|
| Pages |
13
|
| PublisherName |
National Standards Authority of Ireland
|
| Status |
Withdrawn
|
| Supersedes |
| Standards | Relationship |
| EN 50518-3:2013 | Identical |
| BS EN 50518-3:2013 | Equivalent |
| UNE-EN 50518-3:2013 | Equivalent |
| EN 15602:2008 | Security service providers - Terminology |
| EN 50518-1:2013 | Monitoring and alarm receiving centre - Part 1: Location and construction requirements |
| EN 45011:1998 | General requirements for bodies operating product certification systems (ISO/IEC Guide 65:1996) |
| EN 45011 : 1998 | GENERAL REQUIREMENTS FOR BODIES OPERATING PRODUCT CERTIFICATION SYSTEMS |
| EN 15713:2009 | Secure destruction of confidential material - Code of practice |
| EN 50518-2:2013 | Monitoring and alarm receiving centre - Part 2: Technical requirements |
| ISO/IEC 17020:2012 | Conformity assessment — Requirements for the operation of various types of bodies performing inspection |
| ISO/IEC Guide 65:1996 | General requirements for bodies operating product certification systems |
| EN ISO/IEC 17020:2012 | Conformity assessment - Requirements for the operation of various types of bodies performing inspection (ISO/IEC 17020:2012) |