IEEE 1829-2017
Current
The latest, up-to-date edition.
IEEE Guide for Conducting Corona Tests on Hardware for Overhead Transmission Lines and Substations
Hardcopy , PDF
English
03-31-2017
1. Overview
2. Normative references
3. Definitions
4. Test arrangement for transmission line hardware
5. Test procedure
Annex A (informative) - Bibliography
Annex B (informative) - Sample calculation of the voltage
needed for single phase mockup in HV laboratory
Annex C (normative) - Test voltage calibration device
Annex D (informative) - Research on Effect of Altitude
(Relative Air Density) on Corona
Annex E (informative) - Application of RIV data
Annex F (informative) - Sample Photographs
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.