NF EN 13757-2 : 2005
Withdrawn
View Superseded by
COMMUNICATION SYSTEMS FOR AND REMOTE READING OF METERS - PART 2: PHYSICAL AND LINK LAYER
01-12-2013
06-02-2018
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Physical layer specifications
5 Link Layer (master and slave)
6 Tables and figures
Annex A (informative) Schematic implementation of slave
Annex B (informative) Protection against mains voltages
Annex C (informative) Slave powering options
Annex D (informative) Slave collision detect
Annex E (informative) Cable installation
Annex F (informative) Protocol examples
Bibliography
Covers the physical and link layer parameters of baseband communication over twisted pair (M-Bus) for meter communication systems. It is especially applicable to heat meters, heat cost allocators, water meters and gas meters.
| DevelopmentNote |
Indice de classement: E17-901-2PR. PR NF EN 13757-2 June 2002. (07/2002) PR NF EN 13757-2 September 2016. (09/2016)
|
| DocumentType |
Standard
|
| PublisherName |
Association Francaise de Normalisation
|
| Status |
Withdrawn
|
| SupersededBy |
| Standards | Relationship |
| EN 13757-2:2018 | Identical |
| NBN EN 13757-2 : 2005 | Identical |
| NS EN 13757-2 : 1ED 2005 | Identical |
| I.S. EN 13757-2:2005 | Identical |
| BS EN 13757-2:2004 | Identical |
| NEN EN 13757-2 : 2018 | Identical |
| UNE-EN 13757-2:2005 | Identical |
| NF EN 61000-4-4 : 2013 | ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST |
| NF EN 60870 5-2 : 1993 | TELECONTROL EQUIPMENT AND SYSTEMS - PART 5: TRANSMISSION PROTOCOLS - SECTION 2: LINK TRANSMISSION PROCEDURES |