NFP 63 202 : 1995
Withdrawn
Withdrawn
PARQUET - GLUED PARQUET - PART 1: TECHNICAL SPECIFICATIONS - PART 2: SPECIAL REQUIREMENTS
Published date
01-12-2013
Publisher
Withdrawn date
05-08-2008
Sorry this product is not available in your region.
| DevelopmentNote |
2001 version includes NFP 63 202-1 and NFP 63 202-2. (10/2004)
|
| DocumentType |
Standard
|
| PublisherName |
Association Francaise de Normalisation
|
| Status |
Withdrawn
|
| Supersedes |
| NFP 63 201 : 2004 | PARQUET - PARQUET TO BE NAILED - PART 1: TECHNICAL SPECIFICATION - PART 2: SPECIAL CLAUSES |
| NFP 52 302-1 : 93 AMD 1 99 | BUILDING WORKS - EXECUTION OF FLOOR HEATING THROUGH ELECTRIC CABLES SET IN CONCRETE - PART 1: TECHNICAL SPECIFICATIONS |
| NFB 54 000 : 1974 | TIMBER - SOLID WOOD FLOORING STRIPS - MANUFACTURING CHARACTERISTICS |
| NFP 63 202-2 : 1995 | PARQUET - GLUED PARQUET - PART 2: SPECIAL REQUIREMENTS |
| NFB 54 003 : 1991 | TIMBER - GRADING OF SOLID MARITIME PINE FLOORING STRIPS |
| NFP 11 221 : 2000 | BUILDING WORKS - TANKING WORKS - PART 1: TECHNICAL SPECIFICATIONS - PART 2: SPECIAL CLAUSES |
| NFP 63 203-2 : 2004 | BUILDING WORKS - FLOORS OF TIMBER OR WOOD-BASED PANELS - PART 2: SPECIAL ADMINISTRATIVE CLAUSES |
| NFB 54 002 : 1966 | TIMBER - GRADING OF SOLID CHESTNUT FLOORING STRIPS |
| NFP 52 303-2 : 1993 | TRAVAUX DE BATIMENT - MARCHES PRIVES - EXECUTION DE PLANCHERS CHAUFFANTS A EAU CHAUDE UTILISANT DES TUBES EN MATERIAU DE SYNTHESE NOYES DANS LE BETON - PARTIE 2: CAHIER DES CLAUSES SPECIALES |
| NFB 54 001 : 1978 | TIMBER - GRADING OF SOLID OAK FLOORING STRIPS |
| NFB 54 010 : 1982 | TIMBER - MANUFACTURE AND GRADING OF NON-MOSAIC STICK ON WOOD PARQUET |
| NFP 52 301 : 1993 | BUILDING WORKS - EXECUTION OF HEATING PANELS WITH METAL TUBES EMBEDDED IN CONCRETE - TECHNICAL SPECIFICATIONS |
| NFB 54 008 : 2007 | GLUED PARQUETS - BEHAVIOUR IN CLIMATIC ATMOSPHERES OF DIFFERENT HUMIDITY - TEST METHODS AND SPECIFICATIONS |
| NFP 52 303-1 : 1993 | BUILDING WORKS - EXECUTION OF FLOOR HEATING WITH HOT WATER THROUGH SYNTHETIC PIPES SET IN CONCRETE - PART 1: TECHNICAL SPECIFICATIONS |
| NFP 63 203-1 : 93 AMD 1 98 | TRAVAUX DE BATIMENT - PLANCHERS EN BOIS OU EN PANNEAUX DERIVES DU BOIS - PARTIE 1: CAHIER DES CLAUSES TECHNIQUES |
| NFP 14 201-2 : 1993 | BUILDING WORKS - SCREEDS AND SLABS WITH A BASE OF HYDRAULIC BINDERS - PART 2: SPECIAL CLAUSES |
| NFB 57 055 : 1977 | CORK - COMPOUND AGGLOMERATED CORK FOR INSULATION UNDERLAYS FOR PARQUETS INTENDED TO BE GLUED - CHARACTERISTICS |
| NFP 14 201-1 : 93 AMD 3 2003 | BUILDING WORKS - SCREEDS AND SLABS WITH A BASE OF HYDRAULIC BINDERS - PART 1: TECHNICAL SPECIFICATIONS |
| NFB 54 005 : 1966 | TIMBER - GRADING OF SOLID HOME-GROWN FIR AND SPRUCE FLOORING STRIPS |
| NFP 52 302-2 : 1993 | BUILDING WORKS - EXECUTION OF FLOOR HEATING THROUGH ELECTRIC CABLES SET IN CONCRETE - PART 2: SPECIAL CLAUSES |
| NFB 54 009 : 1960 | TIMBER - GRADING OF SOLID BEECH FLOORING STRIPS |
| NFB 54 011 : 1980 | TIMBER - MANUFACTURE AND GRADING OF PLYWOOD PARQUETS WITH BROADLEAVED HARDWOOD TOP PLY |
| NFP 18 201 : 2004 | BUILDING WORKS - EXECUTION OF CONCRETE WORKS - TECHNICAL SPECIFICATIONS |
Summarise
Sorry this product is not available in your region.